 "note": "SECI CfD-I through the TenderOS model: the optimiser's scan, the design surface, a day's dispatch, the levers, the Pool, the bid review.",
 "built": "2026-11-18",
 "tender": {
  "short": "SECI CfD-I",
  "title": "Selection of RE Power Developers under Contract for Difference (CfD) Mechanism for assured Peak Supply of 1000 MWh (500 MW x 2 Hrs.) from ISTS-Connected RE Projects in India under Tariff-Based Competitive Bidding (SECI-CfD-I)",
  "rfsNo": "SECI/C&P/IPP/13/0002/26-27",
  "tenderedMw": 500,
  "totalPages": 216,
  "conditions": 262,
  "groups": {
   "Scheme and bid": 39,
   "Auction": 20,
   "Daily supply": 32,
   "CfD settlement": 19,
   "Plant": 44,
   "Energy sourcing": 6,
   "Dates": 20,
   "Bid security and charges": 27,
   "Penalties and security": 9,
   "Eligibility": 26,
   "Bid documents": 20
  },
  "changes": 40,
  "formats": 17,
  "bidSteps": 14,
  "queries": 12,
  "corpusCr": 76
 },
 "docs": [
  {
   "id": "rfs",
   "title": "RfS",
   "kind": "tender",
   "date": "2026-07-15",
   "pages": 129,
   "summary": "The tender as revised on 15.07.2026 (it replaces the RfS of the same number dated 17.04.2026): 500 MW of assured peak supply, 2 MWh per MW every evening through the power exchanges, settled against the strike price by SECI's CfD Pool; the bid, the e-Reverse Auction, eligibility, guarantees, milestones and the formats (Section 7). Read with the amendments, which override it."
  },
  {
   "id": "cfda",
   "title": "Standard CfD Agreement (CfDA)",
   "kind": "agreement",
   "date": null,
   "pages": 69,
   "summary": "The agreement every winner signs: the daily supply, the time-block settlement against the strike price, the weekly shortfall penalty, the Letter of Credit, the events of default. It prevails over the RfS where they differ (CfDA 1.2.18)."
  },
  {
   "id": "amd1",
   "title": "Amendment-01",
   "kind": "amendment",
   "date": "2026-07-17",
   "pages": 2,
   "summary": "SECI keeps the CfD Pool funded for the whole term; gains above ₹10/kWh split 50:50 (the sharing itself was later replaced by Amendment-03's full pass-through)."
  },
  {
   "id": "amd2",
   "title": "Amendment-02",
   "kind": "amendment",
   "date": "2026-08-03",
   "pages": 5,
   "summary": "A battery of X MW / 2X MWh owned by the bidder becomes mandatory; the SCD applies to the battery (15 months) with the RE generation due by 36 months; the green-market share (25%, plus 75% for charging until month 36, then 50% from group companies); the penalties re-cut for the two deadlines."
  },
  {
   "id": "amd3",
   "title": "Amendment-03",
   "kind": "amendment",
   "date": "2026-10-08",
   "pages": 5,
   "summary": "The term becomes 15 years; the ₹5.80/kWh ceiling goes; the CfD settlement becomes a full pass-through (the bidder nets the strike price on every kWh, the Pool keeps every gain and bears every loss); TAM and G-TAM join the markets; SECI may designate the hours and bid on the RPD's behalf; the EMD validity rule; a new contact."
  },
  {
   "id": "amd4",
   "title": "Amendment-04",
   "kind": "amendment",
   "date": "2026-11-05",
   "pages": 6,
   "summary": "How SECI's designation of the Peak Hours works: the RPD declares the day's availability (MWh) by 06:00 on D-1, or 100% of the contracted capacity is deemed available; SECI instructs the time blocks, price and quantum by 08:00 on D-1, or bids on the RPD's behalf; up to 80% of the availability may go through TAM/G-TAM and the balance through the day-ahead markets, never above the contracted capacity in a block; deviations, DSM and every exchange charge are the RPD's; sale elsewhere when MCPs stay below the strike price needs SECI/MNRE approval. And SECI may restrict the capacity awarded to what the CfD corpus can bear at the discovered tariff."
  }
 ],
 "ev": [
  {
   "id": "capacityBid",
   "group": "Scheme and bid",
   "label": "Capacity you may bid",
   "display": "One bid for you and your group: 50 to 150 MW cumulative, in whole MW",
   "doc": "RfS",
   "clause": "6.1",
   "page": 16,
   "quote": "submit a single bid offering a minimum quantum of cumulative Contracted Capacity of 50 MW and a maximum quantum of 150 MW, in the prescribed formats. The cumulative Contracted Capacity shall be quoted in integral values only."
  },
  {
   "id": "bid",
   "group": "Scheme and bid",
   "label": "What you bid",
   "display": "One strike price in ₹/kWh for all projects applied for; digits after two decimals are ignored",
   "doc": "Amendment-03",
   "clause": "RfS 40.3 (amended)",
   "page": 4,
   "quote": "quoting a single “First Round Tariff” in Indian Rupee per kWh for all the Projects applied for. If it is quoted with more than two digits after decimal, digits after first two decimal places shall be ignored."
  },
  {
   "id": "ceiling",
   "group": "Scheme and bid",
   "label": "Ceiling tariff",
   "display": "None: the ₹5.80/kWh ceiling of the RfS was removed by Amendment-03",
   "doc": "Amendment-03",
   "clause": "RfS 40.3 (original, removed)",
   "page": 4,
   "quote": "The tariff has to be less than or equal to INR 5.80/kWh"
  },
  {
   "id": "emd",
   "group": "Bid security and charges",
   "label": "Earnest Money Deposit (EMD)",
   "display": "₹9.68 lakh/MW solar + ₹13.68 lakh/MW wind or other RE + ₹2.40 lakh/MWh battery, as a bank guarantee or surety bond with the bid",
   "doc": "RfS",
   "clause": "17",
   "page": 31,
   "quote": "Earnest Money Deposit = [INR 9,68,000 x Rated cumulative Installed Capacity of Solar PV component (MW) + INR 13,68,000 x Rated cumulative Installed Capacity of Wind component and other RE generating sources (MW) + INR 2,40,000 x Rated cumulative Installed Capacity of the ESS component (MWh)]."
  },
  {
   "id": "pbg",
   "group": "Bid security and charges",
   "label": "Performance Bank Guarantee (PBG)",
   "display": "₹24.20 lakh/MW solar + ₹34.20 lakh/MW wind or other RE + ₹6.00 lakh/MWh battery, on the installed (AC) capacities",
   "doc": "RfS",
   "clause": "18.1",
   "page": 33,
   "quote": "Performance Bank Guarantee = [INR 24,20,000 x Rated Installed Capacity of Solar component (MW) + INR 34,20,000 x Rated cumulative Installed Capacity of Wind component and other RE generating sources (MW) + INR 6,00,000 x Rated cumulative Installed Capacity of the ESS component (MWh)]."
  },
  {
   "id": "seciHours4",
   "group": "Daily supply",
   "label": "SECI may set the hours",
   "display": "SECI may designate the Peak Hours and time blocks; you must make the power available in them and sell it on the exchanges as it instructs",
   "doc": "Amendment-04",
   "clause": "RfS 9.2.c (amended)",
   "page": 1,
   "quote": "SECI shall have the right, as deemed necessary, to designate the Peak Hours (including specific Time-Blocks) during which the RPD shall make available and sell power from the Project through the Power Exchanges. The RPD shall ensure availability of power during the Peak Hours/Time-Blocks so designated by SECI"
  },
  {
   "id": "declareAvail",
   "group": "Daily supply",
   "label": "Declare the day's availability by 06:00 on D-1",
   "display": "In MWh, day-ahead; the declaration drives what SECI schedules",
   "doc": "Amendment-04",
   "clause": "RfS 9.2.c (b)",
   "page": 1,
   "quote": "The RPD shall declare the availability of energy from the Project, in MWh, on a day-ahead basis, latest by 06:00 hours on the day immediately preceding the day of delivery (‘D-1’ Day for delivery on Day ‘D’)."
  },
  {
   "id": "tamShare",
   "group": "Daily supply",
   "label": "Up to 80% term-ahead, the rest day-ahead",
   "display": "TAM/G-TAM may take up to 80% of the declared availability; the balance goes to DAM/GDAM/HP-DAM; never above the contracted capacity in any block, never sold twice",
   "doc": "Amendment-04",
   "clause": "RfS 9.2.c (e)",
   "page": 2,
   "quote": "For the purpose of sale of power through the TAM and G-TAM, up to 80% of the availability shall be considered for offering/scheduling, as applicable, in the aforesaid markets"
  },
  {
   "id": "corpusCap",
   "group": "Auction",
   "label": "SECI may award less than 500 MW",
   "display": "The capacity awarded is what the CfD corpus can carry at the discovered tariff; SECI may restrict the total award",
   "doc": "Amendment-04",
   "clause": "RfS 42.2.b (amended)",
   "page": 3,
   "quote": "the final capacity to be awarded under the RfS shall be determined by SECI based on an assessment of the financial viability of the discovered Tariff and the corresponding requirement of the CfD Pool, within the available CfD corpus. Accordingly, SECI reserves the right to restrict the total capacity to be awarded under the RfS, as considered necessary, to ensure that the financial implications of the award remain within the available CfD corpus."
  }
 ],
 "changes": [
  {
   "id": "a1-rfs-1.9",
   "amd": 1,
   "amdTitle": "Amendment-01",
   "document": "RfS",
   "clause": "1.9 (addendum)",
   "topic": "The CfD Pool stays funded",
   "effect": "If the ₹76 crore Pool runs dry, SECI tops it up from its own funds for the whole term: the payment security behind every settlement is SECI's balance sheet, not just the fund.",
   "page": 1,
   "diff": "<ins>SECI will maintain the pool for the complete Term of the CfDA, and in case the pool accrual at any given time during this tenure becomes zero/negative, SECI will replenish it with an appropriate amount from its own resources.</ins>",
   "added": 39,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a1-rfs-9.3.a.iv",
   "amd": 1,
   "amdTitle": "Amendment-01",
   "document": "RfS",
   "clause": "9.3.a.iv (addendum)",
   "topic": "Gains above ₹10/kWh",
   "effect": "Under the slab sharing, the part of a market price above ₹10/kWh was to be split half and half; Amendment-03 later rewrote the whole clause as a full pass-through, so this split no longer applies.",
   "page": 1,
   "diff": "<ins>Notwithstanding the gain/loss sharing ratios specified above, for any Time-Block where the MCP exceeds Rs. 10/kWh, the incremental profit/gain attributable to the portion of MCP in excess of Rs. 10/kWh, i.e., corresponding to (MCP – Rs. 10/kWh), shall be shared between the CfD Pool and RPD in the ratio of 50:50. For avoidance of doubt, the gain/loss corresponding to MCP up to Rs. 10/kWh shall continue to be shared in accordance with the slab-wise sharing ratios specified above.</ins>",
   "added": 78,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a1-cfda-1.1",
   "amd": 1,
   "amdTitle": "Amendment-01",
   "document": "CfDA",
   "clause": "1.1 “CfD Pool” (addendum)",
   "topic": "The CfD Pool stays funded",
   "effect": "The same undertaking written into the agreement's definition of the Pool.",
   "page": 1,
   "diff": "<ins>SECI will maintain the pool for the complete Term of the CfDA, and in case the pool accrual at any given time during this tenure becomes zero/negative</ins>",
   "added": 27,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a1-cfda-9.2.iv",
   "amd": 1,
   "amdTitle": "Amendment-01",
   "document": "CfDA",
   "clause": "9.2.iv (addendum)",
   "topic": "Gains above ₹10/kWh",
   "effect": "The same split in the agreement; replaced by Amendment-03's rewrite of Article 9.2.iv.",
   "page": 2,
   "diff": "<ins>Notwithstanding the gain/loss sharing ratios specified above, for any Time-Block where the MCP exceeds Rs. 10/kWh, the incremental profit/gain attributable to the portion of MCP in excess of Rs. 10/kWh, i.e., corresponding to (MCP – Rs. 10/kWh), shall be shared between the CfD Pool and RPD in the ratio of 50:50.</ins>",
   "added": 51,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a2-rfs-4.3",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "RfS",
   "clause": "4.3",
   "topic": "The battery becomes mandatory and yours",
   "effect": "Storage is no longer optional or leasable: for every contracted MW you build and own at least 1 MW / 2 MWh of battery.",
   "page": 1,
   "diff": "<del>In case ESS is installed by the</del> <ins>For a ‘X’ MW Contracted Capacity,</ins> RPD <ins>shall mandatorily install ESS of ‘X’ MW/ ‘2X’ MWh capacity</ins> as part of the <del>Project, such</del> <ins>Project. Such</ins> ESS <del>may</del> <ins>shall</ins> be owned by the RPD <del>or may be tied-up separately with a third party by the RPD,</del> for supply of power through Power Exchanges.",
   "added": 19,
   "removed": 22,
   "isNew": false
  },
  {
   "id": "a2-rfs-9.1.d",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "RfS",
   "clause": "9.1.d",
   "topic": "Where the energy may come from",
   "effect": "25% of each year's energy may be bought in the green market for the whole term; a further 75% may be bought to charge the battery until 36 months from the Effective Date; after that a further 50% may come from your group companies' RE projects, charging only. Shares are measured on the energy discharged, and energy above the limits is not settled.",
   "page": 1,
   "diff": "The RPD shall supply power such that 100% of the annual energy scheduled on the Power Exchange(s) corresponds to RE power. <del>The</del> <ins>For the complete Term of the CfDA, the</ins> RPD <del>can, however,</del> <ins>can</ins> source up to 25% RE power (in energy terms), on annual basis, from the green market sources/bilateral agreements towards meeting the supply conditions stipulated in the RfS/CfDA, as per extant regulations. <ins>It is hereby clarified that sourcing of 25% energy from green market sources/bilateral agreements, as indicated in this Clause, refers to 25% of the total annual energy required to be supplied through the Exchanges. This energy may be supplied directly to the Power Exchange to meet the supply requirements during Peak Hours and/or utilized for charging the ESS for subsequent supply from the ESS during Peak Hours. Further, in the case of supply of energy from the ESS towards meeting this 25% requirement (in part or full), only the energy discharged from the ESS shall be considered for calculating the 25% requirement, and not the corresponding charging energy required. It is hereby clarified that in case of excess supply by the RPD over the 25% limit as stipulated in this provision, the RPD shall not be entitled for CfD settlement against such excess energy supplied and the same shall not be considered while calculating the RPD’s performance with respect to this Clause and Article 4.4.3 of the CfDA. Any liability arising out of such excess energy supply shall be to the sole account of RPD. However, for the period commencing from the Effective Date of CfDA and up to the date as on 36 months therefrom, the RPD shall additionally be permitted to source up to 75% RE power (in energy terms), on annual basis, from the green market sources/ bilateral agreements, provided that such energy is utilized exclusively for charging the ESS for assured Peak supply through ESS during the Peak Hours. Thereafter, from the expiry of 36 months from the Effective Date of CfDA and for the remaining Term of the CfDA, the aforesaid additional sourcing from green market sources and/or bilateral agreements shall no longer be permitted. Instead, the RPD may source up to an additional 50% RE power (in energy terms), on annual basis, from RE Project(s) owned by the Group Companies of the RPD, provided that such energy is utilized exclusively for charging the ESS for assured Peak supply through ESS during the Peak Hours.</ins>",
   "added": 349,
   "removed": 3,
   "isNew": false
  },
  {
   "id": "a2-rfs-10.2.a",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "RfS",
   "clause": "10.2.a",
   "topic": "Two commissioning deadlines",
   "effect": "The SCD (15 months) now applies to the battery; your own solar or wind gets until 36 months from the Effective Date, so supply can start from the battery alone.",
   "page": 2,
   "diff": "The Scheduled Commissioning Date (SCD) for commissioning of the full capacity of the <ins>ESS component of the</ins> Project shall be the date as on 15 months from the Effective Date of the CfDA (for e.g. if Effective Date of the CfDA is 07.08.2026, then SCD shall be 07.11.2027). <ins>The corresponding RE Generating component(s) shall be commissioned by the RPD by the date as on 36 months from the Effective Date of the CfDA (for e.g. if Effective Date of the CfDA is 07.08.2026, then SCSD shall be 07.08.2029).</ins>",
   "added": 44,
   "removed": 0,
   "isNew": false
  },
  {
   "id": "a2-rfs-10.2.b",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "RfS",
   "clause": "10.2.b",
   "topic": "Grace period with penalty",
   "effect": "The 3-month window with penalty is for the battery and the start of supply, not the RE generation.",
   "page": 2,
   "diff": "The maximum time period allowed for commissioning of full <del>Project</del> capacity <ins>of the ESS component of the Project</ins> with applicable penalty, shall be limited to the date as on 3 months from the SCD.",
   "added": 7,
   "removed": 1,
   "isNew": false
  },
  {
   "id": "a2-rfs-10.2.c",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "RfS",
   "clause": "10.2.c",
   "topic": "Penalty for a late start",
   "effect": "In the 3 months after the SCD the PBG is encashed in proportion to whichever is larger: the capacity not yet supplying or the battery not yet commissioned; RE generation late beyond 36 months is penalised pro rata from the next monthly bill.",
   "page": 2,
   "diff": "In case of delay in <ins>commencement of supply of power/ energy corresponding to the full Contracted Capacity or the delay in</ins> commissioning of <ins>full capacity of</ins> the <ins>ESS component of the</ins> Project beyond the SCD until the date as per Clause 10.2.b above, as part of the penalty, the total PBG amount for the Project shall be encashed on pro-rata basis and proportionate to the <ins>higher of the (i)</ins> Contracted Capacity that has not <ins>commenced supply of power/ energy, or (ii) the ESS capacity that has not</ins> been commissioned. <ins>Further, in case of delay in commissioning of RE Generating component(s) beyond 36 months from the Effective Date of CfDA, as part of the penalty the total PBG amount for the Project shall be encashed on pro-rata basis and proportionate to the RE Generating component(s) that has not been commissioned. This penalty shall be recovered from the next monthly bill.</ins>",
   "added": 100,
   "removed": 0,
   "isNew": false
  },
  {
   "id": "a2-rfs-10.2.d",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "RfS",
   "clause": "10.2.d",
   "topic": "Capacity cut after the grace period",
   "effect": "Beyond 3 months after the SCD the contract shrinks to the smaller of the battery commissioned and the capacity supplying; RE generation still missing at 36 months cuts the contract to what was commissioned.",
   "page": 3,
   "diff": "For delay in commissioning of <ins>ESS component of</ins> the Project <ins>or delay in commencement of supply of power/ energy corresponding to the full Contracted Capacity</ins> beyond the date as per Clause 10.2.b above, the Contracted Capacity shall stand reduced to <ins>lower of (i)</ins> the <ins>ESS capacity commissioned, or (ii) the</ins> Project Capacity that has <del>been commissioned</del> <ins>commenced supply of power,</ins> until the date as per Clause 10.2.b <del>above,</del> <ins>above</ins> and CfDA for the balance Contracted Capacity will stand terminated. Also, the PBG corresponding to the <ins>ESS</ins> capacity <del>which</del> <ins>that</ins> has not been commissioned <ins>or the capacity which has not commenced supply of power/ energy, whichever is higher,</ins> until the date as per Clause 10.2.b above, shall be encashed on pro-rata basis. <ins>Further, in case of delay in commissioning of RE Generating component(s) of the Project beyond the corresponding timeline as per Clause 10.2.a above, the Contracted Capacity shall stand reduced to the corresponding Project Capacity that has been commissioned until the date as per Clause 10.2.b above, and CfDA for the balance Contracted Capacity will stand terminated. Also, the amount corresponding to the capacity which has not been commissioned until the date as per Clause 10.2.a above, shall be recovered from the next monthly bill.</ins>",
   "added": 132,
   "removed": 4,
   "isNew": false
  },
  {
   "id": "a2-cfda-3.2.3",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "CfDA",
   "clause": "3.2.3",
   "topic": "Default at the SCD",
   "effect": "The agreement's SCD obligation is the battery and the start of full supply.",
   "page": 3,
   "diff": "If the RPD fails to commission the <ins>ESS component of the</ins> Project <ins>or fails to commence supply of power/ energy corresponding to the full Contracted Capacity</ins> by SCD specified in this Agreement or any further extension thereof granted by SECI (if any), subject to conditions mentioned in Article 4.5,",
   "added": 18,
   "removed": 0,
   "isNew": false
  },
  {
   "id": "a2-cfda-4.1.1.f",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "CfDA",
   "clause": "4.1.1.(f)",
   "topic": "The RPD's obligations",
   "effect": "Commissioning the RE generation by month 36 becomes an obligation of its own.",
   "page": 3,
   "diff": "The commissioning of the <del>Project up</del> <ins>ESS component or the commencement of supply of power/ energy corresponding</ins> to the <ins>full</ins> Contracted Capacity no later than the SCD and continuance of the supply of power in line with Article 4.4 of this Agreement throughout the term of the Agreement. <ins>The commissioning of RE Generating component(s) by the date as on 36 months from the Effective Date of this CfDA.</ins>",
   "added": 32,
   "removed": 2,
   "isNew": false
  },
  {
   "id": "a2-cfda-4.4.1.iv",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "CfDA",
   "clause": "4.4.1.iv",
   "topic": "Where the energy may come from",
   "effect": "The same sourcing rules as RfS 9.1.d, written into the agreement: 25% green market for the term, 75% more for charging until month 36, then 50% from group companies.",
   "page": 4,
   "diff": "<ins>The RPD shall supply power such that 100% of the annual energy scheduled on the Power Exchange(s) corresponds to RE power. For the complete Term of the CfDA, the RPD can source up to 25% RE power (in energy terms), on annual basis, from the green market sources/bilateral agreements towards meeting the supply conditions stipulated in the RfS/CfDA, as per extant regulations. It is hereby clarified that sourcing of 25% energy from green market sources/bilateral agreements, as indicated in this Clause, refers to 25% of the total annual energy required to be supplied through the Exchanges. This energy may be supplied directly to the Power Exchange to meet the supply requirements during Peak Hours and/or utilized for charging the ESS for subsequent supply from the ESS during Peak Hours. Further, in the case of supply of energy from the ESS towards meeting this 25% requirement (in part or full), only the energy discharged from the ESS shall be considered for calculating the 25% requirement, and not the corresponding charging energy required. It is hereby clarified that in case of excess supply by the RPD over the 25% limit as stipulated in this provision, the RPD shall not be entitled for CfD settlement against such excess energy supplied and the same shall not be considered while calculating the RPD’s performance with respect to this Clause and Article 4.4.3 of the CfDA. Any liability arising out of such excess energy supply shall be to the sole account of RPD. However, for the period commencing from the Effective Date of CfDA and up to the date as on 36 months therefrom, the RPD shall additionally be permitted to source up to 75% RE power (in energy terms), on annual basis, from the green market sources/ bilateral agreements, provided that such energy is utilized exclusively for charging the ESS for assured Peak supply through ESS during the Peak Hours. Thereafter, from the expiry of 36 months from the Effective Date of CfDA and for the remaining Term of the CfDA, the aforesaid additional sourcing from green market sources and/or bilateral agreements shall no longer be permitted. Instead, the RPD may source up to an additional 50% RE power (in energy terms), on annual basis, from RE Project(s) owned by the Group Companies of the RPD, provided that such energy is utilized exclusively for charging the ESS for assured Peak supply through ESS during the Peak Hours.</ins>",
   "added": 402,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a2-cfda-4.6.1",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "CfDA",
   "clause": "4.6.1",
   "topic": "Penalty for a late start",
   "effect": "The agreement's penalty for the 3 months after the SCD, and the pro-rata PBG encashment for RE generation late beyond 36 months.",
   "page": 4,
   "diff": "<ins>The RPD shall commission the ESS component of the Project and commence supply of power from the full Contracted Capacity within SCD as defined in this Agreement. If the RPD is unable to commission the ESS component of the Project or fails to commence supply of power from the full Contracted Capacity by the SCD for reasons other than those specified in Article 4.5.1, the RPD shall pay to SECI, penalty for the delay in such commissioning and/ or delay in commencement of supply of power and making the Contracted Capacity available for dispatch by the SCD as per the following: (a) Delay beyond the SCD up to (&amp; including) the date as on 3 months after the SCD or the extended SCD, if applicable: The total PBG/Surety Bond amount shall be encashed on pro-rata basis and proportionate to the higher of the (i) ESS capacity that has not been commissioned, or (ii) the Contracted Capacity that has not commenced supply of power/ energy. (b) For avoidance of doubt it is clarified that provisions of Article 4.6.1 will be applicable even in cases where no capacity (i.e. 0 MW) has commenced power supply. Further, in case of delay in commissioning of RE Generating component(s) beyond 36 months from the Effective Date of CfDA, as part of the penalty, the total PBG amount for the Project shall be encashed on pro-rata basis and proportionate to the RE Generating component(s) that has not been commissioned by this deadline. This penalty shall be recovered from the next monthly bill.</ins>",
   "added": 256,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a2-cfda-4.6.2",
   "amd": 2,
   "amdTitle": "Amendment-02",
   "document": "CfDA",
   "clause": "4.6.2",
   "topic": "Capacity cut after the grace period",
   "effect": "The agreement's capacity cut after 3 months, and for RE generation missing at its deadline.",
   "page": 5,
   "diff": "<ins>The maximum time period allowed for commissioning of ESS component of the Project and commencement of power supply from the full Contracted Capacity with encashment of Performance Bank Guarantee/Surety Bond shall be limited to 3 months after the SCD/extended SCD of the Project. In case, the commissioning of the ESS component of the Project or the commencement of supply of power/ energy from the full Contracted Capacity is delayed beyond 3 months after the SCD/extended SCD, the Contracted Capacity shall stand reduced / amended to lower of the (i) ESS capacity that has been commissioned, or (ii) the capacity which has commenced supply of power, until the date as on 3 months after the SCD/ extended SCD and the CfDA for the balance capacity will stand terminated and shall be reduced from the Contracted Capacity. Further, in case of delay in commissioning of RE Generating component(s) of the Project beyond the corresponding timeline as per Article 4.6.1 above, the Contracted Capacity shall stand reduced to the corresponding Project Capacity that has been commissioned until the date as per Article 4.6.1 above, and CfDA for the balance Contracted Capacity will stand terminated. In this case, the amount corresponding to the capacity which has not been commissioned until the date as per Article 4.6.1 above, shall be recovered from the next monthly bill.</ins>",
   "added": 221,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-rfs-bis-p",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "Bid Information Sheet (P)",
   "topic": "Who to contact",
   "effect": "Queries now go to Sh. Sandeep Kumar, DGM (C&P).",
   "page": 1,
   "diff": "Sh. <del>Pratik Prasun</del> <ins>Sandeep Kumar</ins> DGM (C&amp;P) Contact No.: <del>011-24666237 pratikpr@seci.co.in</del> <ins>011-24666231 sandeeprana@seci.co.in</ins>",
   "added": 4,
   "removed": 4,
   "isNew": false
  },
  {
   "id": "a3-rfs-1.53",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "1.53",
   "topic": "Power exchange markets",
   "effect": "The Term Ahead Market and the Green Term Ahead Market are added to the markets a power exchange runs.",
   "page": 1,
   "diff": "market-based mechanisms such as Day-Ahead Market (DAM), Real-Time Market (RTM), Green Day-Ahead Market (GDAM), High-Price Day Ahead Market <del>(HP-DAM)</del> <ins>(HP-DAM), Term Ahead Market (TAM), Green Term Ahead Market (G-TAM),</ins> or any other market segment as may be introduced from time to time.",
   "added": 10,
   "removed": 1,
   "isNew": false
  },
  {
   "id": "a3-rfs-1.76",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "1.76 (new)",
   "topic": "Term Ahead Contract",
   "effect": "A new definition: a contract traded today for delivery two or more days ahead.",
   "page": 1,
   "diff": "<ins>“TERM AHEAD CONTRACT” means a contract (including Green Term Ahead Contract) wherein transactions occur on day (T) and physical delivery of electricity is on a day more than one day ahead (T+ 2 or more);</ins>",
   "added": 35,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-rfs-1.77",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "1.77 (new)",
   "topic": "Term Ahead Market",
   "effect": "A new definition.",
   "page": 1,
   "diff": "<ins>“TERM AHEAD MARKET” or “TAM” means a market where Term Ahead Contracts are transacted on the Power Exchange(s);</ins>",
   "added": 18,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-rfs-1.78",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "1.78 (new)",
   "topic": "Green Term Ahead Market",
   "effect": "A new definition.",
   "page": 1,
   "diff": "<ins>“GREEN TERM AHEAD MARKET” or “G-TAM” means a specialized market segment introduced under power exchange regulations for bilateral trading of electricity generated from renewable energy sources.</ins>",
   "added": 26,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-rfs-2.3",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "2.3",
   "topic": "Term of the CfDA",
   "effect": "The agreement runs 15 years instead of 12.",
   "page": 1,
   "diff": "SECI shall enter into a Contract for Difference (CfD) Agreement (hereinafter referred to as “CfDA”) with the <del>successful</del> <ins>Successful</ins> Bidders selected based on this RfS for supply of Renewable Energy in the Power Markets through Power Exchanges for a period of <del>12</del> <ins>15</ins> years based on the terms, conditions and provisions of the RfS and CfDA.",
   "added": 2,
   "removed": 2,
   "isNew": false
  },
  {
   "id": "a3-rfs-9.2.b",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "9.2.b",
   "topic": "Markets you may sell in",
   "effect": "TAM and G-TAM are now markets the peak supply may be sold in; the words “based on Collective Transaction” are dropped.",
   "page": 1,
   "diff": "Selection of appropriate Power Exchange, as well as the appropriate Market <del>(GDAM/DAM/HPDAM/RTM</del> <ins>(GDAM/ DAM/ HPDAM/ RTM/ TAM/ G-TAM</ins> or any other similar Market <del>based on Collective Transaction</del> as recognized by the CERC for <del>power sale)</del> <ins>sale of power)</ins> for sale of electricity on daily basis, shall be the discretion of the RPD.",
   "added": 9,
   "removed": 7,
   "isNew": false
  },
  {
   "id": "a3-rfs-9.2.c",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "9.2.c",
   "topic": "SECI may set the hours and bid for you",
   "effect": "When SECI designates the hours you must keep the power available for them, and SECI may schedule or bid it on your behalf.",
   "page": 2,
   "diff": " <span class=\"fold\">… 24 words unchanged …</span> Time-Blocks) during which the RPD shall supply power from the Project through the Power <del>Exchanges</del> <ins>Exchanges. The RPD shall accordingly ensure availability of such power for scheduling</ins> and <ins>sale through</ins> the Power <del>Exchange.</del> <ins>Exchanges during the Peak Hours/Time-Blocks so designated by SECI. SECI may, as deemed necessary, undertake or facilitate the scheduling and/or bidding of such power on behalf of the RPD in the Power Exchanges, and the RPD shall provide all necessary cooperation and information in this regard.</ins> Further, during the period in which the MCPs in the above markets are expected <span class=\"fold\">… 28 words unchanged …</span> ",
   "added": 60,
   "removed": 2,
   "isNew": false
  },
  {
   "id": "a3-rfs-9.3.a.iv",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "9.3.a.iv",
   "topic": "Settlement: full pass-through",
   "effect": "The slab sharing (70:30, 50:50, 30:70) goes: the Pool takes the whole gain when the market clears above the strike price and pays the whole shortfall when it clears below, so you net the strike price on every kWh settled. Amendment-01's split above ₹10/kWh is replaced with it.",
   "page": 2,
   "diff": "Sharing of Profit/ Gains and Losses: <del>Profit/ Gains</del> <ins>The profit/gain</ins> and <del>losses</del> <ins>loss arising from the sale of electricity by the RPD through the Power Exchanges</ins> shall be <del>shared</del> <ins>settled</ins> between the RPD and the CfD Stabilization Fund <del>(“Pool”),</del> <ins>(“CfD Pool”)</ins> in <del>a dynamic grading as follows:</del> <ins>respect of each Time-Block, such that the RPD shall be entitled to receive the Strike Price (“SP”) for the electricity supplied from the Project, subject to the following: a. In case the MCP is higher than the SP: The amount corresponding to the difference between the MCP and the SP, i.e. (MCP – SP), shall constitute the profit/gain for the respective Time-Block. The entire amount of such profit/gain shall be passed on by the RPD to the CfD Pool. b. In case the MCP is lower than the SP: The RPD shall be compensated from the CfD Pool for the difference between the SP and the MCP, i.e. (SP – MCP), for the respective Time-Block, such that the RPD receives an amount equivalent to the SP for the electricity supplied from the Project. c. In case the MCP is equal to the SP: No amount shall be payable by either the RPD or the CfD Pool on account of gain or loss for the respective Time-Block. Accordingly, the RPD shall neither retain any profit/gain nor bear any loss on account of variation between the MCP and the SP. While calculating the profit/gain or loss, rounding off the difference between MCP and SP shall not be carried out. The settlement of profit/gains or losses between the CfD Pool and the RPD shall be inclusive of applicable taxes, if any.</ins>",
   "added": 247,
   "removed": 10,
   "isNew": false
  },
  {
   "id": "a3-rfs-9.3.a.vi.a",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "9.3.a.vi.a",
   "topic": "RECs in brown markets",
   "effect": "Sales in the TAM also earn RECs, half of whose proceeds go to the Pool.",
   "page": 3,
   "diff": "For the quantum of electricity sold in the brown markets (such as <del>DAM/RTM),</del> <ins>DAM/RTM/TAM etc.),</ins>",
   "added": 2,
   "removed": 1,
   "isNew": false
  },
  {
   "id": "a3-rfs-17",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "17",
   "topic": "EMD validity",
   "effect": "An EMD valid 12 months from the original deadline need not be extended during evaluation if it still runs at least 6 months past the final deadline; a winner extends it at least 30 days before it expires.",
   "page": 3,
   "diff": "<del>The</del> <ins>In case the</ins> EMD <del>shall be valid as per</del> <ins>submitted by</ins> the <del>timelines stipulated above. However, shortfall in</del> <ins>Bidder, having been valid for a period of 12 months from</ins> the <del>EMD validity, if any, up to</del> <ins>original bid submission deadline, remains valid for</ins> a period of <del>seven (7) days shall be acceptable. Further, an additional shortfall only in</del> <ins>at least 6 months beyond</ins> the <del>following cases shall be acceptable: If</del> <ins>final bid submission deadline (after considering all extension(s), if any),</ins> the Bidder <del>has submitted</del> <ins>shall not be required to extend</ins> the <del>EMD with</del> validity <del>as per original</del> <ins>of such EMD during the</ins> bid <del>submission date or</del> <ins>evaluation stage. However, in case the Bidder emerges</ins> as <del>per any revised submission date and if</del> the <del>deadline for submission</del> <ins>Successful Bidder, it shall extend the validity</ins> of <del>bids has been extended further,</del> the <del>EMD shall</del> <ins>EMD, as may</ins> be <del>acceptable provided,</del> <ins>required, such that</ins> the EMD <del>is</del> <ins>remains</ins> valid <del>for more than two months from</del> <ins>in accordance with</ins> the <del>actual date</del> <ins>provisions</ins> of <del>bid submission and the</del> <ins>this Clause. The Successful</ins> Bidder <del>submits the EMD extension for</del> <ins>shall submit</ins> the requisite <del>period within seven</del> <ins>extension of EMD validity not later than 30</ins> days <del>from</del> <ins>prior to</ins> the <del>date</del> <ins>expiry</ins> of <del>actual bid submission, if required.</del> <ins>the existing EMD validity.</ins>",
   "added": 96,
   "removed": 93,
   "isNew": false
  },
  {
   "id": "a3-rfs-21.2",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "21.2",
   "topic": "Term of the CfDA",
   "effect": "15 years from the SCD; any extension by mutual agreement.",
   "page": 3,
   "diff": "The CfDAs shall be valid for a period of <del>12</del> <ins>15</ins> years from the SCD. Any extension of the CfDA period beyond <del>12</del> <ins>15</ins> years shall be through mutual agreement between the RPD and SECI.",
   "added": 2,
   "removed": 2,
   "isNew": false
  },
  {
   "id": "a3-rfs-21.7",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "21.7",
   "topic": "After the term",
   "effect": "The same freedom to keep operating, after 15 years.",
   "page": 3,
   "diff": "The RPDs are free to operate their projects after expiry of the <del>12</del> <ins>15</ins> years of CfDA period if other conditions such as land lease etc., permit. However, any extension of the CfDA period beyond <del>12</del> <ins>15</ins> years shall be through mutual agreements between the RPD and SECI, provided that the <span class=\"fold\">… 11 words unchanged …</span> utilities and system operators permit operation of the Project beyond the initial period of <del>12</del> <ins>15</ins> years.",
   "added": 3,
   "removed": 3,
   "isNew": false
  },
  {
   "id": "a3-rfs-40.3",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "RfS",
   "clause": "40.3",
   "topic": "No ceiling tariff",
   "effect": "The ₹5.80/kWh ceiling and the summary rejection above it are removed; one first-round tariff, two decimals.",
   "page": 4,
   "diff": " <span class=\"fold\">… 25 words unchanged …</span> “First Round Tariff” in Indian Rupee per kWh for all the Projects applied for. <del>The tariff has to be less than or equal to INR 5.80/kWh and shall be quoted up to two places of decimal only.</del> If it is quoted with more than two digits after decimal, digits after first <span class=\"fold\">… 9 words unchanged …</span> the quoted tariff is INR 3.337, then it shall be considered as INR 3.33). <del>Further, the bids where the tariff quoted are more than INR 5.80/kWh shall be summarily rejected.</del>",
   "added": 0,
   "removed": 39,
   "isNew": false
  },
  {
   "id": "a3-cfda-expiry",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "1.1 “Expiry Date”",
   "topic": "Term of the CfDA",
   "effect": "The agreement expires 15 years from the SCD.",
   "page": 4,
   "diff": "shall mean the date occurring as on <del>twelve (12)</del> <ins>fifteen (15)</ins> years from the Scheduled Commissioning Date (SCD);",
   "added": 2,
   "removed": 2,
   "isNew": false
  },
  {
   "id": "a3-cfda-tac",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "1.1 (new)",
   "topic": "Term Ahead Contract",
   "effect": "The new definition in the agreement.",
   "page": 4,
   "diff": "<ins>“TERM AHEAD CONTRACT” means a contract (including Green Term Ahead Contract) wherein transactions occur on day (T) and physical delivery of electricity is on a day more than one day ahead (T+ 2 or more);</ins>",
   "added": 35,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-cfda-tam",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "1.1 (new)",
   "topic": "Term Ahead Market",
   "effect": "The new definition in the agreement.",
   "page": 4,
   "diff": "<ins>“TERM AHEAD MARKET” or “TAM” means a market where Term Ahead Contracts are transacted on the Power Exchange(s);</ins>",
   "added": 18,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-cfda-gtam",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "1.1 (new)",
   "topic": "Green Term Ahead Market",
   "effect": "The new definition in the agreement.",
   "page": 4,
   "diff": "<ins>“GREEN TERM AHEAD MARKET” or “G-TAM” means a specialized market segment introduced under power exchange regulations for bilateral trading of electricity generated from renewable energy sources.</ins>",
   "added": 26,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-cfda-4.4.2.ii",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "4.4.2.ii",
   "topic": "Markets you may sell in",
   "effect": "TAM and G-TAM added in the agreement.",
   "page": 4,
   "diff": "Selection of appropriate Power Exchange, as well as the appropriate Market <del>(DAM/GDAM/HPDAM/RTM</del> <ins>(GDAM/ DAM/ HPDAM/ RTM/ TAM/ G-TAM</ins> or any other similar Market <del>based on Collective Transaction</del> as recognized by the CERC for <del>power sale)</del> <ins>sale of power)</ins> for sale of electricity on daily basis, shall be the discretion of the RPD.",
   "added": 9,
   "removed": 7,
   "isNew": false
  },
  {
   "id": "a3-cfda-4.4.2.iv",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "4.4.2.iv",
   "topic": "SECI may set the hours and bid for you",
   "effect": "The same right in the agreement.",
   "page": 4,
   "diff": " <span class=\"fold\">… 24 words unchanged …</span> Time-Blocks) during which the RPD shall supply power from the Project through the Power <del>Exchanges</del> <ins>Exchanges. The RPD shall accordingly ensure availability of such power for scheduling</ins> and <ins>sale through</ins> the Power <del>Exchange.</del> <ins>Exchanges during the Peak Hours/Time-Blocks so designated by SECI. SECI may, as deemed necessary, undertake or facilitate the scheduling and/or bidding of such power on behalf of the RPD in the Power Exchanges, and the RPD shall provide all necessary cooperation and information in this regard.</ins> Further, during the period in which the MCPs in the above markets are expected <span class=\"fold\">… 28 words unchanged …</span> ",
   "added": 60,
   "removed": 2,
   "isNew": false
  },
  {
   "id": "a3-cfda-9.2.iv",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "9.2.iv",
   "topic": "Settlement: full pass-through",
   "effect": "The agreement's settlement article rewritten: you neither retain any gain nor bear any loss between the market price and the strike price.",
   "page": 5,
   "diff": "<ins>Sharing of Profit/ Gains and Losses: The profit/gain and loss arising from the sale of electricity by the RPD through the Power Exchanges shall be settled between the RPD and the CfD Stabilization Fund (“CfD Pool”) in respect of each Time-Block, such that the RPD shall be entitled to receive the Strike Price (“SP”) for the electricity supplied from the Project, subject to the following: a. In case the MCP is higher than the SP: The amount corresponding to the difference between the MCP and the SP, i.e. (MCP – SP), shall constitute the profit/gain for the respective Time-Block. The entire amount of such profit/gain shall be passed on by the RPD to the CfD Pool. b. In case the MCP is lower than the SP: The RPD shall be compensated from the CfD Pool for the difference between the SP and the MCP, i.e. (SP – MCP), for the respective Time-Block, such that the RPD receives an amount equivalent to the SP for the electricity supplied from the Project. c. In case the MCP is equal to the SP: No amount shall be payable by either the RPD or the CfD Pool on account of gain or loss for the respective Time-Block. For avoidance of doubt, the entire profit/gain arising from the difference between MCP and SP, where MCP is higher than SP, shall accrue to the CfD Pool, and the entire loss arising from the difference between SP and MCP, where MCP is lower than SP, shall be borne by the CfD Pool. Accordingly, the RPD shall neither retain any profit/gain nor bear any loss on account of variation between the MCP and the SP. While calculating the profit/gain or loss, rounding off the difference between MCP and SP shall not be carried out. The settlement of profit/gains or losses between the CfD Pool and the RPD shall be inclusive of applicable taxes, if any.</ins>",
   "added": 317,
   "removed": 0,
   "isNew": true
  },
  {
   "id": "a3-cfda-9.2.vi.a",
   "amd": 3,
   "amdTitle": "Amendment-03",
   "document": "CfDA",
   "clause": "9.2.vi.a",
   "topic": "RECs in brown markets",
   "effect": "TAM sales earn RECs too.",
   "page": 5,
   "diff": "For the quantum of electricity sold in the brown markets (such as <del>DAM/RTM),</del> <ins>DAM/RTM/TAM etc.),</ins>",
   "added": 2,
   "removed": 1,
   "isNew": false
  },
  {
   "id": "a4-rfs-9.2.c",
   "amd": 4,
   "amdTitle": "Amendment-04",
   "document": "RfS",
   "clause": "9.2.c",
   "topic": "Availability, SECI's instructions, TAM/G-TAM, deviations and charges",
   "effect": "Amendment-03's one paragraph becomes an operating procedure: you declare the day's availability in MWh by 06:00 on D-1 (silence means 100% of the contracted capacity), SECI tells you the blocks, price and quantum by 08:00 on D-1 or bids for you, up to 80% of the availability may be sold term-ahead (TAM/G-TAM) with the rest day-ahead, never above the contracted capacity in any block, and every deviation, DSM charge and exchange fee is yours, recoverable from your next bill if SECI pays it. The model's plant availability and exchange fee inputs carry these; the DSM exposure sits in your availability figure.",
   "page": 1,
   "diff": "Notwithstanding <del>the above,</del> <ins>anything contained elsewhere in this RfS and CfDA,</ins> during the Term of the CfDA, <del>if deemed necessary,</del> SECI shall have the <del>right</del> <ins>right, as deemed necessary,</ins> to designate the Peak Hours (including specific Time-Blocks) during which the RPD shall <del>supply</del> <ins>make available and sell</ins> power from the Project through the Power Exchanges. The RPD shall <del>accordingly</del> ensure availability of <del>such</del> power <del>for scheduling and sale through the Power Exchanges</del> during the Peak Hours/Time-Blocks so designated by <del>SECI.</del> SECI <del>may, as deemed necessary, undertake or facilitate</del> <ins>and shall comply with</ins> the <del>scheduling and/or bidding</del> <ins>following provisions: (b) Declaration</ins> of <del>such power</del> <ins>Availability: The RPD shall declare the availability of energy from the Project, in MWh,</ins> on <del>behalf</del> <ins>a day-ahead basis, latest by 06:00 hours on the day immediately preceding the day</ins> of <ins>delivery (‘D-1’ Day for delivery on Day ‘D’). In case</ins> the RPD <del>in</del> <ins>fails to declare</ins> the <ins>availability within the stipulated timeline, the availability of power and energy shall be deemed to correspond to 100% of the applicable Contracted Capacity for the relevant Peak Hours/ Time-Blocks, and the RPD shall be responsible for ensuring availability accordingly. SECI shall communicate to the RPD, on a day-ahead basis, the applicable Time-Blocks, price and quantum of power to be offered for sale on the</ins> Power Exchanges, <ins>latest by 08:00 hours on ‘D-1’ Day for delivery on Day ‘D’. For the purpose of sale of power through the TAM</ins> and <ins>G-TAM, up to 80% of</ins> the <ins>availability shall be considered for offering/scheduling, as applicable, in the aforesaid markets, subject to the applicable market rules and scheduling procedures. The balance of the day-ahead declared availability, i.e., the difference between the availability declared by the</ins> RPD <ins>for a Day and the quantum scheduled for sale through TAM/G-TAM for that Day,</ins> shall <del>provide all necessary cooperation</del> <ins>be considered for offering/scheduling, as applicable, through the DAM/ GDAM/ HP-DAM or any other suitable day-ahead market, in accordance with the instructions of SECI</ins> and <del>information</del> <ins>the applicable market rules. The same quantum of power/ energy shall not be offered or committed for sale more than once for the same Day. The aggregate power scheduled for sale through TAM/G-TAM and DAM/GDAM/HP-DAM or any other applicable market shall not exceed the Contracted Capacity</ins> in <ins>any Time-Block. Any penalties, charges or financial liabilities arising on account of revisions to the schedule, deviations from the schedule, deviation settlement mechanism (DSM) or any other scheduling-related non-compliance attributable to the RPD, including failure to maintain the declared availability or to comply with SECI's instructions, shall be borne entirely by the RPD. All charges, fees and other financial obligations, including transaction charges, exchange fees, transmission and scheduling charges, and any other applicable charges or levies associated with the offering, bidding, scheduling and sale of power through the Power Exchanges, shall be borne by the RPD. In the event SECI incurs any such charges, fees or financial liabilities in connection with the sale of power under</ins> this <del>regard.</del> <ins>Clause, the same shall be recoverable from the RPD and adjusted against the payments due to the RPD in the immediately succeeding monthly bill.</ins>",
   "added": 417,
   "removed": 38,
   "isNew": false
  },
  {
   "id": "a4-rfs-42.2.b",
   "amd": 4,
   "amdTitle": "Amendment-04",
   "document": "RfS",
   "clause": "42.2.b",
   "topic": "SECI may award less than 500 MW",
   "effect": "The award is no longer 500 MW by right: SECI will award only what the CfD corpus can carry at the discovered strike price. A high price wins less capacity, or none; the Bid review sizes the Pool's pay-out at your price against the corpus.",
   "page": 3,
   "diff": "<del>will not</del> <ins>Notwithstanding the above, the final capacity to</ins> be <del>eligible</del> <ins>awarded under the RfS shall be determined by SECI based on an assessment of the financial viability of the discovered Tariff and the corresponding requirement of the CfD Pool, within the available CfD corpus. Accordingly, SECI reserves the right</ins> to <ins>restrict the total capacity to</ins> be <del>declared</del> <ins>awarded under the RfS,</ins> as <del>Successful Bidders.</del> <ins>considered necessary, to ensure that the financial implications of the award remain within the available CfD corpus.</ins>",
   "added": 72,
   "removed": 6,
   "isNew": false
  },
  {
   "id": "a4-cfda-4.4.2.iv",
   "amd": 4,
   "amdTitle": "Amendment-04",
   "document": "CfDA",
   "clause": "4.4.2.iv",
   "topic": "The same procedure in the CfDA",
   "effect": "The CfDA carries the same clauses (i) to (p) as the RfS's (a) to (h), so the procedure binds under the agreement you sign, not only the RfS.",
   "page": 4,
   "diff": "Notwithstanding <del>the above,</del> <ins>anything contained elsewhere in this CfDA,</ins> during the Term of the CfDA, <del>if deemed necessary,</del> SECI shall have the <del>right</del> <ins>right, as deemed necessary,</ins> to designate the Peak Hours (including specific Time-Blocks) during which the RPD shall <del>supply</del> <ins>make available and sell</ins> power from the Project through the Power Exchanges. <ins>The aggregate power scheduled for sale through TAM/G-TAM and DAM/GDAM/HP-DAM or any other applicable market shall not exceed the Contracted Capacity in any Time-Block. All activities relating to the offering, bidding, scheduling and sale of power under this Clause shall be undertaken in accordance with the applicable regulations, grid code, procedures of the relevant scheduling authorities, and bye-laws, rules, business rules and operating procedures of the concerned Power Exchange, as amended from time to time.</ins>",
   "added": 89,
   "removed": 7,
   "isNew": false
  }
 ],
 "net": [
  {
   "label": "Term of the agreement",
   "was": "12 years",
   "now": "15 years",
   "change": "a3-rfs-2.3",
   "amd": 3
  },
  {
   "label": "Ceiling tariff",
   "was": "₹5.80/kWh",
   "now": "None",
   "change": "a3-rfs-40.3",
   "amd": 3
  },
  {
   "label": "Battery",
   "was": "Optional, may be a third party's",
   "now": "Mandatory X MW / 2X MWh, owned",
   "change": "a2-rfs-4.3",
   "amd": 2
  },
  {
   "label": "Commissioning",
   "was": "Whole project by month 15",
   "now": "Battery by month 15, RE by month 36",
   "change": "a2-rfs-10.2.a",
   "amd": 2
  },
  {
   "label": "Charging power",
   "was": "25% from the green market",
   "now": "+75% until month 36, then +50% group RE",
   "change": "a2-rfs-9.1.d",
   "amd": 2
  },
  {
   "label": "Settlement",
   "was": "Gains and losses shared in slabs",
   "now": "Full pass-through at the strike price",
   "change": "a3-rfs-9.3.a.iv",
   "amd": 3
  },
  {
   "label": "CfD Pool",
   "was": "A fund of ₹76 crore",
   "now": "SECI replenishes it for the whole term",
   "change": "a1-rfs-1.9",
   "amd": 1
  },
  {
   "label": "Markets",
   "was": "DAM, RTM, GDAM, HP-DAM",
   "now": "+ TAM and G-TAM",
   "change": "a3-rfs-9.2.b",
   "amd": 3
  },
  {
   "label": "Peak hours",
   "was": "The bidder's choice",
   "now": "SECI may designate them, day-ahead",
   "change": "a4-rfs-9.2.c",
   "amd": 4
  },
  {
   "label": "Award",
   "was": "500 MW",
   "now": "What the CfD corpus can carry",
   "change": "a4-rfs-42.2.b",
   "amd": 4
  }
 ],
 "stats": {
  "sims": 140,
  "pricings": 1713,
  "seconds": 100.9,
  "daysPerSim": 5478
 },
 "win": {
  "contractedMw": 100,
  "solarMw": 10,
  "tariff": 8.322,
  "equityIrr": 0.13,
  "projectIrr": 0.0876,
  "minDscr": 1.2,
  "avgDscr": 2.38,
  "payback": 11,
  "lcoe": 7.98,
  "debt": 187.2,
  "equity": 62.4,
  "capex": {
   "total": 249.6,
   "solar": 36,
   "wind": 0,
   "bess": 170,
   "pcs": 0,
   "evac": 30,
   "other": 1.8,
   "preop": 11.9,
   "idc": 0,
   "bridgeFee": 0,
   "fees": 0
  },
  "inputs": {
   "contractedMw": 100,
   "essMwhPerMw": 2,
   "extraEssMwhPerMw": 0,
   "essMwPerMw": 1,
   "solarMw": 10,
   "windMw": 0,
   "reCodMonths": 21,
   "availability": 0.97,
   "solarCuf": 0.25,
   "solarDcAc": 1.4,
   "solarDegradation": 0.005,
   "windCuf": 0.33,
   "windDegradation": 0,
   "rte": 0.87,
   "essSocMin": null,
   "essSocMax": null,
   "essDegradation": 0.02,
   "marketCharges": 0.3,
   "groupPrice": 2.5,
   "groupCharges": 0,
   "priceEscalation": 0,
   "gdamShareCap": 0.2,
   "recPrice": 150,
   "essCrPerMwh": 0.85,
   "solarCrPerMw": 3.6,
   "windCrPerMw": 6.5,
   "evacuationCrPerMw": 0.3,
   "preopPct": 0.05,
   "augDecline": 0.05,
   "essOmLakhPerMwh": 1.2,
   "solarOmLakhPerMw": 4,
   "windOmLakhPerMw": 9,
   "otherFixedLakhPerMw": 2,
   "insurancePct": 0.003,
   "omEscalation": 0.05,
   "pxFee": 0.02,
   "lcCostPct": 0.01,
   "pbgCostPct": 0.01,
   "gstRate": 0.18,
   "targetEquityIrr": 0.13,
   "debtFraction": 0.75,
   "interestRate": 0.0875,
   "tenorYears": 15,
   "taxRate": 0.2517,
   "essLifeYears": 15,
   "reLifeYears": 25,
   "discountRate": 0.1,
   "effectiveDate": "2027-02-01",
   "sellMarket": "DAM",
   "useMarket": true,
   "useGroup": true,
   "merchant": true,
   "augmentation": "annual",
   "afterTerm": "none",
   "merchantYears": 0,
   "shortfallPolicy": "meet",
   "priceScenario": "flat"
  }
 },
 "scan": [
  {
   "mw": 0,
   "sp": 9.501,
   "shortMwh": 234595
  },
  {
   "mw": 2,
   "sp": 9.241,
   "shortMwh": 185898
  },
  {
   "mw": 4,
   "sp": 8.984,
   "shortMwh": 137201
  },
  {
   "mw": 6,
   "sp": 8.773,
   "shortMwh": 88505
  },
  {
   "mw": 8,
   "sp": 8.517,
   "shortMwh": 39808
  },
  {
   "mw": 10,
   "sp": 8.322,
   "shortMwh": 0
  },
  {
   "mw": 12,
   "sp": 8.366,
   "shortMwh": 0
  },
  {
   "mw": 14,
   "sp": 8.407,
   "shortMwh": 0
  },
  {
   "mw": 16,
   "sp": 8.455,
   "shortMwh": 0
  },
  {
   "mw": 18,
   "sp": 8.498,
   "shortMwh": 0
  },
  {
   "mw": 20,
   "sp": 8.531,
   "shortMwh": 0
  },
  {
   "mw": 22,
   "sp": 8.575,
   "shortMwh": 0
  },
  {
   "mw": 24,
   "sp": 8.626,
   "shortMwh": 0
  },
  {
   "mw": 26,
   "sp": 8.686,
   "shortMwh": 0
  },
  {
   "mw": 28,
   "sp": 8.753,
   "shortMwh": 0
  },
  {
   "mw": 30,
   "sp": 8.817,
   "shortMwh": 0
  },
  {
   "mw": 32,
   "sp": 8.864,
   "shortMwh": 0
  },
  {
   "mw": 34,
   "sp": 8.901,
   "shortMwh": 0
  },
  {
   "mw": 36,
   "sp": 8.927,
   "shortMwh": 0
  },
  {
   "mw": 38,
   "sp": 8.944,
   "shortMwh": 0
  },
  {
   "mw": 40,
   "sp": 8.952,
   "shortMwh": 0
  },
  {
   "mw": 42,
   "sp": 8.961,
   "shortMwh": 0
  },
  {
   "mw": 44,
   "sp": 8.977,
   "shortMwh": 0
  },
  {
   "mw": 46,
   "sp": 8.999,
   "shortMwh": 0
  },
  {
   "mw": 48,
   "sp": 9.025,
   "shortMwh": 0
  },
  {
   "mw": 50,
   "sp": 9.061,
   "shortMwh": 0
  },
  {
   "mw": 52,
   "sp": 9.098,
   "shortMwh": 0
  },
  {
   "mw": 54,
   "sp": 9.136,
   "shortMwh": 0
  },
  {
   "mw": 56,
   "sp": 9.175,
   "shortMwh": 0
  },
  {
   "mw": 58,
   "sp": 9.214,
   "shortMwh": 0
  },
  {
   "mw": 60,
   "sp": 9.255,
   "shortMwh": 0
  }
 ],
 "best": 10,
 "grid": {
  "solar": [
   0,
   2,
   4,
   6,
   8,
   10,
   12,
   14,
   16,
   18,
   20,
   22,
   24,
   26,
   28,
   30,
   32,
   34,
   36,
   38,
   40
  ],
  "wind": [
   0,
   5,
   10,
   15,
   20
  ],
  "ess": [
   0.65,
   0.85,
   1.05,
   1.25
  ],
  "irr": [
   0.11,
   0.13,
   0.15,
   0.17
  ],
  "sp": [
   8.43,
   8.612,
   8.812,
   9.034,
   9.258,
   9.501,
   9.772,
   10.081,
   10.15,
   10.525,
   10.937,
   11.38,
   11.241,
   11.679,
   12.162,
   12.679,
   7.787,
   8.031,
   8.3,
   8.589,
   8.635,
   8.93,
   9.257,
   9.611,
   9.485,
   9.836,
   10.249,
   10.71,
   10.382,
   10.83,
   11.323,
   11.852,
   7.28,
   7.583,
   7.919,
   8.281,
   8.153,
   8.509,
   8.903,
   9.328,
   9.026,
   9.435,
   9.887,
   10.376,
   9.899,
   10.361,
   10.873,
   11.426,
   7.355,
   7.706,
   8.094,
   8.514,
   8.228,
   8.632,
   9.079,
   9.562,
   9.102,
   9.558,
   10.063,
   10.61,
   9.975,
   10.484,
   11.048,
   11.658,
   7.335,
   7.72,
   8.154,
   8.633,
   8.195,
   8.637,
   9.138,
   9.681,
   9.058,
   9.563,
   10.123,
   10.729,
   9.931,
   10.489,
   11.108,
   11.777,
   8.154,
   8.351,
   8.569,
   8.804,
   8.983,
   9.241,
   9.528,
   9.84,
   9.851,
   10.196,
   10.607,
   11.049,
   10.86,
   11.294,
   11.772,
   12.286,
   7.502,
   7.762,
   8.05,
   8.358,
   8.363,
   8.675,
   9.02,
   9.391,
   9.224,
   9.588,
   9.991,
   10.449,
   10.09,
   10.532,
   11.019,
   11.543,
   7.299,
   7.612,
   7.959,
   8.334,
   8.172,
   8.538,
   8.944,
   9.381,
   9.045,
   9.464,
   9.928,
   10.429,
   9.918,
   10.391,
   10.913,
   11.477,
   7.375,
   7.733,
   8.133,
   8.565,
   8.245,
   8.659,
   9.117,
   9.613,
   9.118,
   9.585,
   10.102,
   10.661,
   9.992,
   10.511,
   11.087,
   11.709,
   7.347,
   7.744,
   8.183,
   8.675,
   8.207,
   8.655,
   9.168,
   9.723,
   9.066,
   9.581,
   10.152,
   10.771,
   9.939,
   10.507,
   11.138,
   11.819,
   7.878,
   8.091,
   8.326,
   8.58,
   8.717,
   8.984,
   9.287,
   9.618,
   9.585,
   9.916,
   10.316,
   10.755,
   10.524,
   10.954,
   11.427,
   11.935,
   7.195,
   7.472,
   7.779,
   8.108,
   8.069,
   8.399,
   8.763,
   9.156,
   8.942,
   9.325,
   9.748,
   10.204,
   9.816,
   10.252,
   10.734,
   11.254,
   7.322,
   7.646,
   8.005,
   8.392,
   8.196,
   8.572,
   8.989,
   9.439,
   9.069,
   9.498,
   9.974,
   10.487,
   9.942,
   10.425,
   10.959,
   11.535,
   7.393,
   7.757,
   8.168,
   8.613,
   8.258,
   8.683,
   9.152,
   9.66,
   9.132,
   9.608,
   10.137,
   10.708,
   10.005,
   10.535,
   11.122,
   11.757,
   7.357,
   7.765,
   8.211,
   8.715,
   8.216,
   8.67,
   9.195,
   9.762,
   9.076,
   9.596,
   10.179,
   10.81,
   9.944,
   10.523,
   11.165,
   11.859,
   7.641,
   7.869,
   8.122,
   8.395,
   8.493,
   8.773,
   9.083,
   9.418,
   9.345,
   9.68,
   10.056,
   10.491,
   10.224,
   10.649,
   11.118,
   11.62,
   7.217,
   7.505,
   7.823,
   8.165,
   8.091,
   8.431,
   8.807,
   9.212,
   8.964,
   9.357,
   9.791,
   10.26,
   9.837,
   10.283,
   10.776,
   11.308,
   7.351,
   7.685,
   8.054,
   8.454,
   8.224,
   8.611,
   9.039,
   9.501,
   9.097,
   9.537,
   10.023,
   10.549,
   9.97,
   10.463,
   11.008,
   11.597,
   7.417,
   7.787,
   8.21,
   8.668,
   8.279,
   8.713,
   9.195,
   9.715,
   9.152,
   9.639,
   10.179,
   10.763,
   10.025,
   10.566,
   11.164,
   11.811,
   7.367,
   7.787,
   8.238,
   8.755,
   8.226,
   8.69,
   9.222,
   9.802,
   9.086,
   9.612,
   10.207,
   10.85,
   9.949,
   10.538,
   11.192,
   11.899,
   7.354,
   7.599,
   7.87,
   8.162,
   8.219,
   8.517,
   8.846,
   9.199,
   9.084,
   9.434,
   9.821,
   10.247,
   9.949,
   10.367,
   10.831,
   11.329,
   7.255,
   7.553,
   7.882,
   8.236,
   8.128,
   8.479,
   8.866,
   9.283,
   9.002,
   9.405,
   9.85,
   10.331,
   9.875,
   10.331,
   10.836,
   11.379,
   7.387,
   7.731,
   8.112,
   8.524,
   8.26,
   8.657,
   9.096,
   9.571,
   9.133,
   9.583,
   10.081,
   10.619,
   10.006,
   10.509,
   11.066,
   11.667,
   7.433,
   7.809,
   8.243,
   8.713,
   8.292,
   8.735,
   9.228,
   9.761,
   9.163,
   9.661,
   10.212,
   10.809,
   10.037,
   10.587,
   11.198,
   11.857,
   7.379,
   7.812,
   8.271,
   8.798,
   8.239,
   8.714,
   9.253,
   9.845,
   9.098,
   9.631,
   10.237,
   10.893,
   9.958,
   10.557,
   11.222,
   11.942,
   7.135,
   7.396,
   7.685,
   7.995,
   8.009,
   8.322,
   8.669,
   9.042,
   8.882,
   9.248,
   9.654,
   10.089,
   9.755,
   10.174,
   10.639,
   11.138,
   7.284,
   7.592,
   7.932,
   8.299,
   8.157,
   8.518,
   8.916,
   9.346,
   9.03,
   9.444,
   9.901,
   10.394,
   9.904,
   10.37,
   10.886,
   11.442,
   7.419,
   7.774,
   8.166,
   8.59,
   8.293,
   8.7,
   9.15,
   9.637,
   9.166,
   9.626,
   10.135,
   10.685,
   10.039,
   10.552,
   11.12,
   11.734,
   7.449,
   7.836,
   8.278,
   8.76,
   8.309,
   8.757,
   9.262,
   9.807,
   9.176,
   9.683,
   10.246,
   10.856,
   10.049,
   10.61,
   11.232,
   11.904,
   7.393,
   7.837,
   8.309,
   8.842,
   8.253,
   8.74,
   9.284,
   9.889,
   9.112,
   9.65,
   10.269,
   10.937,
   9.972,
   10.577,
   11.254,
   11.986,
   7.169,
   7.44,
   7.74,
   8.062,
   8.042,
   8.366,
   8.724,
   9.109,
   8.915,
   9.292,
   9.708,
   10.157,
   9.788,
   10.218,
   10.693,
   11.205,
   7.307,
   7.625,
   7.977,
   8.356,
   8.181,
   8.551,
   8.961,
   9.403,
   9.054,
   9.477,
   9.946,
   10.451,
   9.927,
   10.403,
   10.931,
   11.499,
   7.455,
   7.818,
   8.221,
   8.658,
   8.327,
   8.744,
   9.206,
   9.705,
   9.2,
   9.67,
   10.19,
   10.753,
   10.073,
   10.596,
   11.176,
   11.801,
   7.471,
   7.869,
   8.317,
   8.812,
   8.33,
   8.785,
   9.301,
   9.859,
   9.193,
   9.711,
   10.286,
   10.908,
   10.066,
   10.638,
   11.271,
   11.956,
   7.404,
   7.861,
   8.345,
   8.884,
   8.265,
   8.764,
   9.314,
   9.932,
   9.124,
   9.669,
   10.298,
   10.98,
   9.984,
   10.595,
   11.284,
   12.028,
   7.2,
   7.482,
   7.792,
   8.127,
   8.073,
   8.407,
   8.777,
   9.174,
   8.947,
   9.333,
   9.761,
   10.222,
   9.82,
   10.26,
   10.746,
   11.27,
   7.338,
   7.666,
   8.029,
   8.421,
   8.211,
   8.592,
   9.013,
   9.468,
   9.085,
   9.518,
   9.998,
   10.516,
   9.958,
   10.444,
   10.983,
   11.564,
   7.486,
   7.855,
   8.27,
   8.719,
   8.354,
   8.781,
   9.255,
   9.766,
   9.227,
   9.707,
   10.239,
   10.815,
   10.1,
   10.634,
   11.225,
   11.863,
   7.488,
   7.897,
   8.352,
   8.859,
   8.347,
   8.808,
   9.336,
   9.906,
   9.207,
   9.734,
   10.321,
   10.955,
   10.079,
   10.661,
   11.306,
   12.003,
   7.413,
   7.882,
   8.378,
   8.923,
   8.274,
   8.785,
   9.34,
   9.97,
   9.133,
   9.687,
   10.325,
   11.019,
   9.993,
   10.61,
   11.31,
   12.067,
   7.237,
   7.529,
   7.851,
   8.198,
   8.111,
   8.455,
   8.835,
   9.245,
   8.984,
   9.381,
   9.82,
   10.293,
   9.857,
   10.307,
   10.805,
   11.341,
   7.375,
   7.713,
   8.087,
   8.491,
   8.248,
   8.639,
   9.072,
   9.538,
   9.121,
   9.565,
   10.056,
   10.586,
   9.994,
   10.491,
   11.041,
   11.635,
   7.517,
   7.893,
   8.32,
   8.781,
   8.382,
   8.819,
   9.304,
   9.828,
   9.255,
   9.745,
   10.289,
   10.876,
   10.128,
   10.672,
   11.274,
   11.924,
   7.501,
   7.922,
   8.382,
   8.902,
   8.36,
   8.827,
   9.366,
   9.949,
   9.22,
   9.753,
   10.351,
   10.998,
   10.088,
   10.68,
   11.336,
   12.046,
   7.42,
   7.9,
   8.409,
   8.96,
   8.281,
   8.804,
   9.365,
   10.008,
   9.14,
   9.706,
   10.349,
   11.056,
   10,
   10.623,
   11.334,
   12.104,
   7.27,
   7.572,
   7.905,
   8.264,
   8.143,
   8.498,
   8.889,
   9.311,
   9.017,
   9.424,
   9.874,
   10.359,
   9.89,
   10.35,
   10.859,
   11.407,
   7.421,
   7.769,
   8.155,
   8.571,
   8.294,
   8.695,
   9.139,
   9.618,
   9.167,
   9.621,
   10.123,
   10.666,
   10.041,
   10.548,
   11.109,
   11.714,
   7.546,
   7.928,
   8.366,
   8.84,
   8.407,
   8.854,
   9.351,
   9.887,
   9.28,
   9.78,
   10.335,
   10.935,
   10.153,
   10.707,
   11.32,
   11.984,
   7.509,
   7.943,
   8.408,
   8.941,
   8.369,
   8.845,
   9.392,
   9.988,
   9.228,
   9.767,
   10.377,
   11.036,
   10.092,
   10.694,
   11.362,
   12.085,
   7.424,
   7.917,
   8.439,
   8.995,
   8.285,
   8.82,
   9.39,
   10.042,
   9.145,
   9.723,
   10.371,
   11.091,
   10.005,
   10.633,
   11.357,
   12.139,
   7.294,
   7.605,
   7.95,
   8.322,
   8.167,
   8.531,
   8.935,
   9.369,
   9.04,
   9.457,
   9.919,
   10.417,
   9.913,
   10.384,
   10.904,
   11.465,
   7.468,
   7.827,
   8.223,
   8.652,
   8.342,
   8.753,
   9.208,
   9.699,
   9.215,
   9.679,
   10.192,
   10.747,
   10.088,
   10.605,
   11.177,
   11.795,
   7.571,
   7.959,
   8.409,
   8.894,
   8.43,
   8.885,
   9.393,
   9.942,
   9.301,
   9.811,
   10.378,
   10.99,
   10.174,
   10.738,
   11.363,
   12.038,
   7.515,
   7.961,
   8.434,
   8.977,
   8.375,
   8.863,
   9.416,
   10.024,
   9.235,
   9.779,
   10.401,
   11.073,
   10.094,
   10.706,
   11.386,
   12.121,
   7.427,
   7.931,
   8.466,
   9.028,
   8.288,
   8.836,
   9.417,
   10.076,
   9.149,
   9.738,
   10.392,
   11.124,
   10.008,
   10.642,
   11.377,
   12.172,
   7.327,
   7.649,
   8.005,
   8.389,
   8.2,
   8.575,
   8.99,
   9.436,
   9.074,
   9.501,
   9.974,
   10.484,
   9.947,
   10.427,
   10.959,
   11.533,
   7.52,
   7.888,
   8.295,
   8.736,
   8.393,
   8.814,
   9.28,
   9.783,
   9.266,
   9.74,
   10.264,
   10.831,
   10.139,
   10.666,
   11.25,
   11.88,
   7.588,
   7.987,
   8.443,
   8.941,
   8.447,
   8.908,
   9.427,
   9.989,
   9.313,
   9.834,
   10.412,
   11.037,
   10.186,
   10.761,
   11.397,
   12.085,
   7.519,
   7.977,
   8.462,
   9.011,
   8.379,
   8.879,
   9.437,
   10.058,
   9.239,
   9.789,
   10.422,
   11.107,
   10.098,
   10.715,
   11.407,
   12.155,
   7.426,
   7.943,
   8.49,
   9.061,
   8.288,
   8.848,
   9.441,
   10.105,
   9.148,
   9.75,
   10.409,
   11.153,
   10.008,
   10.653,
   11.394,
   12.202,
   7.368,
   7.7,
   8.068,
   8.464,
   8.242,
   8.626,
   9.052,
   9.511,
   9.115,
   9.552,
   10.037,
   10.559,
   9.988,
   10.479,
   11.022,
   11.608,
   7.567,
   7.941,
   8.36,
   8.813,
   8.436,
   8.867,
   9.344,
   9.86,
   9.309,
   9.793,
   10.329,
   10.908,
   10.183,
   10.72,
   11.314,
   11.956,
   7.597,
   8.008,
   8.47,
   8.98,
   8.456,
   8.923,
   9.454,
   10.028,
   9.318,
   9.849,
   10.439,
   11.076,
   10.191,
   10.776,
   11.424,
   12.124,
   7.517,
   7.987,
   8.485,
   9.039,
   8.378,
   8.89,
   9.453,
   10.086,
   9.237,
   9.793,
   10.438,
   11.135,
   10.097,
   10.719,
   11.423,
   12.183,
   7.425,
   7.952,
   8.512,
   9.096,
   8.285,
   8.857,
   9.463,
   10.132,
   9.146,
   9.76,
   10.423,
   11.181,
   10.005,
   10.663,
   11.408,
   12.229,
   7.418,
   7.76,
   8.138,
   8.547,
   8.291,
   8.686,
   9.122,
   9.594,
   9.164,
   9.612,
   10.107,
   10.642,
   10.037,
   10.538,
   11.092,
   11.69,
   7.605,
   7.987,
   8.416,
   8.881,
   8.471,
   8.913,
   9.401,
   9.929,
   9.345,
   9.838,
   10.386,
   10.977,
   10.218,
   10.765,
   11.371,
   12.025,
   7.602,
   8.025,
   8.492,
   9.015,
   8.461,
   8.934,
   9.476,
   10.062,
   9.321,
   9.86,
   10.461,
   11.111,
   10.191,
   10.786,
   11.446,
   12.159,
   7.512,
   7.994,
   8.506,
   9.064,
   8.373,
   8.898,
   9.465,
   10.112,
   9.233,
   9.8,
   10.45,
   11.16,
   10.092,
   10.72,
   11.435,
   12.208,
   7.425,
   7.962,
   8.536,
   9.132,
   8.283,
   8.868,
   9.487,
   10.161,
   9.145,
   9.771,
   10.44,
   11.21,
   10.004,
   10.674,
   11.425,
   12.258,
   7.475,
   7.827,
   8.216,
   8.637,
   8.348,
   8.753,
   9.201,
   9.684,
   9.221,
   9.679,
   10.185,
   10.732,
   10.094,
   10.605,
   11.171,
   11.781,
   7.633,
   8.02,
   8.462,
   8.939,
   8.495,
   8.946,
   9.446,
   9.986,
   9.368,
   9.872,
   10.431,
   11.034,
   10.242,
   10.799,
   11.416,
   12.083,
   7.597,
   8.032,
   8.504,
   9.04,
   8.456,
   8.935,
   9.488,
   10.087,
   9.316,
   9.86,
   10.473,
   11.136,
   10.181,
   10.787,
   11.458,
   12.184,
   7.506,
   8,
   8.524,
   9.088,
   8.367,
   8.904,
   9.476,
   10.136,
   9.227,
   9.807,
   10.461,
   11.184,
   10.086,
   10.72,
   11.446,
   12.232,
   7.418,
   7.966,
   8.553,
   9.162,
   8.275,
   8.871,
   9.504,
   10.183,
   9.136,
   9.775,
   10.455,
   11.231,
   9.996,
   10.678,
   11.433,
   12.279,
   7.529,
   7.891,
   8.292,
   8.724,
   8.402,
   8.817,
   9.276,
   9.771,
   9.275,
   9.743,
   10.261,
   10.82,
   10.149,
   10.669,
   11.246,
   11.868,
   7.642,
   8.036,
   8.488,
   8.978,
   8.502,
   8.962,
   9.473,
   10.025,
   9.374,
   9.888,
   10.457,
   11.073,
   10.247,
   10.814,
   11.443,
   12.122,
   7.59,
   8.038,
   8.514,
   9.063,
   8.45,
   8.94,
   9.499,
   10.11,
   9.309,
   9.859,
   10.483,
   11.159,
   10.169,
   10.785,
   11.469,
   12.207,
   7.496,
   8.002,
   8.54,
   9.108,
   8.357,
   8.907,
   9.491,
   10.156,
   9.217,
   9.809,
   10.468,
   11.204,
   10.077,
   10.715,
   11.454,
   12.252,
   7.409,
   7.968,
   8.568,
   9.19,
   8.264,
   8.873,
   9.519,
   10.203,
   9.125,
   9.777,
   10.47,
   11.251,
   9.986,
   10.68,
   11.44,
   12.299,
   7.567,
   7.938,
   8.35,
   8.794,
   8.44,
   8.864,
   9.334,
   9.842,
   9.313,
   9.79,
   10.319,
   10.89,
   10.186,
   10.717,
   11.304,
   11.938,
   7.643,
   8.045,
   8.506,
   9.008,
   8.503,
   8.968,
   9.491,
   10.056,
   9.37,
   9.894,
   10.475,
   11.104,
   10.243,
   10.821,
   11.461,
   12.152,
   7.581,
   8.042,
   8.53,
   9.085,
   8.442,
   8.945,
   9.508,
   10.132,
   9.301,
   9.856,
   10.492,
   11.181,
   10.161,
   10.783,
   11.478,
   12.229,
   7.483,
   8.002,
   8.552,
   9.126,
   8.344,
   8.907,
   9.503,
   10.173,
   9.205,
   9.809,
   10.473,
   11.221,
   10.064,
   10.713,
   11.458,
   12.27,
   7.405,
   7.974,
   8.588,
   9.223,
   8.258,
   8.879,
   9.538,
   10.227,
   9.12,
   9.784,
   10.49,
   11.276,
   9.98,
   10.687,
   11.452,
   12.324,
   7.597,
   7.975,
   8.398,
   8.855,
   8.467,
   8.901,
   9.383,
   9.902,
   9.34,
   9.827,
   10.367,
   10.951,
   10.213,
   10.754,
   11.353,
   11.999,
   7.641,
   8.055,
   8.521,
   9.035,
   8.5,
   8.971,
   9.505,
   10.083,
   9.362,
   9.897,
   10.49,
   11.131,
   10.235,
   10.824,
   11.475,
   12.18,
   7.568,
   8.041,
   8.542,
   9.101,
   8.429,
   8.944,
   9.511,
   10.149,
   9.288,
   9.848,
   10.496,
   11.197,
   10.148,
   10.774,
   11.481,
   12.245,
   7.474,
   8.006,
   8.57,
   9.157,
   8.336,
   8.911,
   9.521,
   10.195,
   9.197,
   9.814,
   10.482,
   11.244,
   10.056,
   10.717,
   11.467,
   12.292,
   7.406,
   7.985,
   8.612,
   9.26,
   8.258,
   8.89,
   9.562,
   10.263,
   9.118,
   9.795,
   10.514,
   11.305,
   9.979,
   10.699,
   11.469,
   12.353,
   7.617,
   8.001,
   8.435,
   8.904,
   8.482,
   8.927,
   9.419,
   9.951,
   9.355,
   9.853,
   10.404,
   11,
   10.229,
   10.78,
   11.389,
   12.048,
   7.633,
   8.06,
   8.53,
   9.058,
   8.493,
   8.969,
   9.515,
   10.105,
   9.352,
   9.895,
   10.5,
   11.154,
   10.223,
   10.821,
   11.485,
   12.202,
   7.557,
   8.043,
   8.558,
   9.121,
   8.419,
   8.947,
   9.518,
   10.169,
   9.278,
   9.849,
   10.503,
   11.217,
   10.138,
   10.77,
   11.488,
   12.266,
   7.471,
   8.014,
   8.592,
   9.191,
   8.332,
   8.92,
   9.542,
   10.222,
   9.193,
   9.823,
   10.496,
   11.271,
   10.053,
   10.726,
   11.481,
   12.319,
   7.41,
   8,
   8.64,
   9.301,
   8.262,
   8.905,
   9.59,
   10.303,
   9.121,
   9.811,
   10.541,
   11.339,
   9.982,
   10.714,
   11.493,
   12.387,
   7.628,
   8.018,
   8.463,
   8.945,
   8.489,
   8.944,
   9.448,
   9.992,
   9.362,
   9.87,
   10.432,
   11.041,
   10.235,
   10.796,
   11.418,
   12.089,
   7.622,
   8.062,
   8.537,
   9.077,
   8.482,
   8.964,
   9.521,
   10.124,
   9.341,
   9.889,
   10.506,
   11.173,
   10.206,
   10.816,
   11.491,
   12.221,
   7.553,
   8.051,
   8.579,
   9.148,
   8.414,
   8.955,
   9.532,
   10.195,
   9.274,
   9.858,
   10.517,
   11.244,
   10.134,
   10.771,
   11.502,
   12.292,
   7.472,
   8.028,
   8.618,
   9.231,
   8.334,
   8.934,
   9.569,
   10.255,
   9.195,
   9.837,
   10.521,
   11.303,
   10.055,
   10.74,
   11.501,
   12.351,
   7.42,
   8.019,
   8.672,
   9.346,
   8.272,
   8.925,
   9.622,
   10.349,
   9.129,
   9.83,
   10.574,
   11.377,
   9.99,
   10.734,
   11.526,
   12.426,
   7.631,
   8.026,
   8.484,
   8.978,
   8.491,
   8.952,
   9.468,
   10.025,
   9.36,
   9.878,
   10.453,
   11.073,
   10.233,
   10.805,
   11.438,
   12.122,
   7.615,
   8.067,
   8.547,
   9.101,
   8.475,
   8.97,
   9.532,
   10.148,
   9.335,
   9.888,
   10.516,
   11.196,
   10.194,
   10.814,
   11.502,
   12.245,
   7.555,
   8.065,
   8.606,
   9.18,
   8.416,
   8.969,
   9.557,
   10.228,
   9.276,
   9.872,
   10.536,
   11.276,
   10.136,
   10.779,
   11.522,
   12.325,
   7.482,
   8.048,
   8.651,
   9.277,
   8.342,
   8.953,
   9.602,
   10.294,
   9.203,
   9.857,
   10.553,
   11.342,
   10.063,
   10.761,
   11.527,
   12.39,
   7.434,
   8.043,
   8.708,
   9.395,
   8.285,
   8.949,
   9.659,
   10.398,
   9.141,
   9.855,
   10.611,
   11.421,
   10.002,
   10.759,
   11.562,
   12.469
  ],
  "phys": [
   {
    "shortDays": 1219,
    "supply": 0.7559,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 33.3%",
     "highest: 66.7%",
     "1,219 days short (75.6% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "186 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 0,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 0,
    "delivered": 51.76
   },
   {
    "shortDays": 577,
    "supply": 0.8791,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 29.3%",
     "highest: 58.5%",
     "577 days short (87.9% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "95 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 8.24,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 1.27,
    "delivered": 60.2
   },
   {
    "shortDays": 6,
    "supply": 0.9693,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 26.1%",
     "highest: 52.1%",
     "6 days short (96.9% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "2 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 16.48,
    "market": 25.79,
    "group": 31.1,
    "windDirect": 2.55,
    "delivered": 66.37
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 43.6%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 24.03,
    "market": 25.79,
    "group": 22.14,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 33.6%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 29.14,
    "market": 25.79,
    "group": 15.57,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 1026,
    "supply": 0.8003,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 31.2%",
     "highest: 62.5%",
     "1,026 days short (80.0% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "159 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 3.5,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 0,
    "delivered": 54.8
   },
   {
    "shortDays": 324,
    "supply": 0.9236,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 27.3%",
     "highest: 54.6%",
     "324 days short (92.4% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "59 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 11.74,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 1.27,
    "delivered": 63.24
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 48.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 19.98,
    "market": 25.79,
    "group": 27.66,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 37.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 27.24,
    "market": 25.79,
    "group": 18.93,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 27.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 32.04,
    "market": 25.79,
    "group": 12.66,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 812,
    "supply": 0.8448,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 29.4%",
     "highest: 58.8%",
     "812 days short (84.5% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "128 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 7,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 0,
    "delivered": 57.85
   },
   {
    "shortDays": 20,
    "supply": 0.9679,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.6%",
     "highest: 51.2%",
     "20 days short (96.8% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "11 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 15.24,
    "market": 25.79,
    "group": 33.7,
    "windDirect": 1.27,
    "delivered": 66.28
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 41.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 23.47,
    "market": 25.79,
    "group": 24.16,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 31.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 30.42,
    "market": 25.79,
    "group": 15.75,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 22.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 34.89,
    "market": 25.79,
    "group": 9.81,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 567,
    "supply": 0.8892,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 27.8%",
     "highest: 55.5%",
     "567 days short (88.9% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "94 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 10.49,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 0,
    "delivered": 60.89
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 46.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 18.73,
    "market": 25.79,
    "group": 30.36,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 35.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 26.97,
    "market": 25.79,
    "group": 20.66,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 25.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 33.56,
    "market": 25.79,
    "group": 12.61,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 16.6%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 37.66,
    "market": 24.84,
    "group": 7.99,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 282,
    "supply": 0.9337,
    "checks": "mmmfffi",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 26.3%",
     "highest: 52.6%",
     "282 days short (93.4% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "53 weeks penalised at 1.5 × (highest evening MCP − SP)"
    ],
    "own": 13.99,
    "market": 25.79,
    "group": 33.71,
    "windDirect": 0,
    "delivered": 63.93
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 40.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 22.23,
    "market": 25.79,
    "group": 26.86,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 29.6%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 30.45,
    "market": 25.79,
    "group": 17.19,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 19.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 36.58,
    "market": 25.79,
    "group": 9.59,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 11.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 40.33,
    "market": 23.12,
    "group": 7.05,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 49.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 17.49,
    "market": 25.79,
    "group": 33.07,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 35.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 25.73,
    "market": 25.79,
    "group": 23.37,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 23.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 33.87,
    "market": 25.79,
    "group": 13.77,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 13.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 39.55,
    "market": 24.84,
    "group": 7.57,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 9.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 42.94,
    "market": 21.41,
    "group": 6.14,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 44.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 20.99,
    "market": 25.79,
    "group": 29.57,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 30.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 29.23,
    "market": 25.79,
    "group": 19.87,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 17.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 37.21,
    "market": 25.79,
    "group": 10.43,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 10.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 42.45,
    "market": 22.93,
    "group": 6.57,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 22.5%",
     "highest: 8.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 45.47,
    "market": 19.73,
    "group": 5.3,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 39.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 24.49,
    "market": 25.79,
    "group": 26.07,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 25.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 32.73,
    "market": 25.79,
    "group": 16.37,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 11.6%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 40.49,
    "market": 25.55,
    "group": 7.38,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 24.9%",
     "highest: 8.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 45.24,
    "market": 21.08,
    "group": 5.64,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 18.0%",
     "highest: 6.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 47.85,
    "market": 18.13,
    "group": 4.51,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 34.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 27.99,
    "market": 25.79,
    "group": 22.57,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 20.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 36.23,
    "market": 25.79,
    "group": 12.87,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 9.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 43.65,
    "market": 23.49,
    "group": 6.29,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 20.0%",
     "highest: 7.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 47.9,
    "market": 19.26,
    "group": 4.8,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 13.7%",
     "highest: 5.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 50.1,
    "market": 16.6,
    "group": 3.79,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 29.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 31.48,
    "market": 25.79,
    "group": 19.07,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 15.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 39.72,
    "market": 25.76,
    "group": 9.4,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 22.6%",
     "highest: 8.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 46.72,
    "market": 21.4,
    "group": 5.3,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 15.2%",
     "highest: 6.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 50.42,
    "market": 17.5,
    "group": 4.04,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 9.8%",
     "highest: 4.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 52.2,
    "market": 15.17,
    "group": 3.13,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 24.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 34.98,
    "market": 25.78,
    "group": 15.58,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 10.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 43.22,
    "market": 25.31,
    "group": 6.35,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 17.4%",
     "highest: 7.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 49.66,
    "market": 19.32,
    "group": 4.43,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 11.0%",
     "highest: 5.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 52.78,
    "market": 15.86,
    "group": 3.32,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 7.9%",
     "highest: 4.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 54.15,
    "market": 13.85,
    "group": 2.5,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 19.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 38.48,
    "market": 25.75,
    "group": 12.12,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 22.0%",
     "highest: 8.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 46.66,
    "market": 22.92,
    "group": 5.3,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 13.4%",
     "highest: 5.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 52.45,
    "market": 17.32,
    "group": 3.65,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 8.8%",
     "highest: 4.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 54.94,
    "market": 14.37,
    "group": 2.64,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 6.1%",
     "highest: 3.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 55.88,
    "market": 12.71,
    "group": 1.9,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 14.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 41.98,
    "market": 25.71,
    "group": 8.65,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 18.5%",
     "highest: 7.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 50.01,
    "market": 20.52,
    "group": 4.36,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 10.7%",
     "highest: 4.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 55.01,
    "market": 15.5,
    "group": 2.91,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 6.8%",
     "highest: 3.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 56.86,
    "market": 13.08,
    "group": 2.01,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 4.7%",
     "highest: 2.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 57.38,
    "market": 11.73,
    "group": 1.38,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 25.0%",
     "highest: 9.8%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 45.48,
    "market": 25.22,
    "group": 5.65,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 15.2%",
     "highest: 5.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 53.21,
    "market": 18.21,
    "group": 3.46,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 8.3%",
     "highest: 3.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 57.29,
    "market": 13.93,
    "group": 2.2,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 5.2%",
     "highest: 2.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 58.5,
    "market": 12.03,
    "group": 1.43,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 3.4%",
     "highest: 1.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 58.67,
    "market": 10.89,
    "group": 0.94,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 22.4%",
     "highest: 7.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 48.98,
    "market": 22.82,
    "group": 4.55,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 12.0%",
     "highest: 4.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 56.15,
    "market": 16.1,
    "group": 2.63,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 6.4%",
     "highest: 2.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 59.18,
    "market": 12.69,
    "group": 1.55,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 3.8%",
     "highest: 1.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 59.88,
    "market": 11.12,
    "group": 0.95,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 2.3%",
     "highest: 1.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 59.66,
    "market": 10.24,
    "group": 0.59,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 18.7%",
     "highest: 6.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 52.42,
    "market": 20.34,
    "group": 3.58,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 9.3%",
     "highest: 3.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 58.56,
    "market": 14.43,
    "group": 1.89,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 4.8%",
     "highest: 1.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 60.69,
    "market": 11.71,
    "group": 1.02,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 2.7%",
     "highest: 1.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 60.91,
    "market": 10.46,
    "group": 0.59,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.6%",
     "highest: 0.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 60.32,
    "market": 9.83,
    "group": 0.35,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 15.4%",
     "highest: 4.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 55.45,
    "market": 18.2,
    "group": 2.7,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 7.2%",
     "highest: 2.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 60.48,
    "market": 13.13,
    "group": 1.28,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 3.5%",
     "highest: 1.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.84,
    "market": 10.95,
    "group": 0.62,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.9%",
     "highest: 0.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.59,
    "market": 10.03,
    "group": 0.34,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.1%",
     "highest: 0.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 60.75,
    "market": 9.55,
    "group": 0.2,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 12.6%",
     "highest: 3.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 58,
    "market": 16.43,
    "group": 1.91,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 5.5%",
     "highest: 1.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.94,
    "market": 12.17,
    "group": 0.77,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 2.6%",
     "highest: 0.7%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.61,
    "market": 10.45,
    "group": 0.35,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.4%",
     "highest: 0.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.03,
    "market": 9.73,
    "group": 0.19,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 0.8%",
     "highest: 0.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.02,
    "market": 9.37,
    "group": 0.11,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 10.2%",
     "highest: 2.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 60.05,
    "market": 15.03,
    "group": 1.27,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 4.3%",
     "highest: 0.9%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.94,
    "market": 11.5,
    "group": 0.44,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 2.0%",
     "highest: 0.4%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 63.1,
    "market": 10.12,
    "group": 0.2,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.1%",
     "highest: 0.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.3,
    "market": 9.55,
    "group": 0.1,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 0.6%",
     "highest: 0.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.17,
    "market": 9.27,
    "group": 0.06,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 8.4%",
     "highest: 1.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.55,
    "market": 13.99,
    "group": 0.8,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 3.6%",
     "highest: 0.5%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 63.56,
    "market": 11.07,
    "group": 0.25,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.6%",
     "highest: 0.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 63.4,
    "market": 9.89,
    "group": 0.13,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 0.9%",
     "highest: 0.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.44,
    "market": 9.45,
    "group": 0.07,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 0.5%",
     "highest: 0.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.24,
    "market": 9.21,
    "group": 0.04,
    "windDirect": 5.09,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 7.1%",
     "highest: 1.0%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.57,
    "market": 13.25,
    "group": 0.52,
    "windDirect": 0,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 3.0%",
     "highest: 0.3%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 63.93,
    "market": 10.77,
    "group": 0.18,
    "windDirect": 1.27,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 1.3%",
     "highest: 0.2%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 63.59,
    "market": 9.73,
    "group": 0.1,
    "windDirect": 2.55,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 0.7%",
     "highest: 0.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 62.54,
    "market": 9.36,
    "group": 0.06,
    "windDirect": 3.82,
    "delivered": 66.42
   },
   {
    "shortDays": 0,
    "supply": 0.97,
    "checks": "mmmmmmm",
    "detail": [
     "100 MW; 50 to 150 MW in whole MW",
     "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year",
     "21 months after the SCD (01 Feb 2030); at most 21",
     "highest after month 36: 0.4%",
     "highest: 0.1%",
     "every day; 97.0% of the mandate supplied",
     "no week below 90% of 14 MWh/MW"
    ],
    "own": 61.28,
    "market": 9.18,
    "group": 0.04,
    "windDirect": 5.09,
    "delivered": 66.42
   }
  ],
  "capex": [
   169.8,
   211.8,
   253.8,
   295.8,
   203.9,
   245.9,
   287.9,
   329.9,
   238.1,
   280.1,
   322.1,
   364.1,
   272.3,
   314.3,
   356.3,
   398.3,
   306.4,
   348.4,
   390.4,
   432.4,
   177.4,
   219.4,
   261.4,
   303.4,
   211.5,
   253.5,
   295.5,
   337.5,
   245.7,
   287.7,
   329.7,
   371.7,
   279.9,
   321.9,
   363.9,
   405.9,
   314,
   356,
   398,
   440,
   184.9,
   226.9,
   268.9,
   310.9,
   219.1,
   261.1,
   303.1,
   345.1,
   253.3,
   295.3,
   337.3,
   379.3,
   287.4,
   329.4,
   371.4,
   413.4,
   321.6,
   363.6,
   405.6,
   447.6,
   192.5,
   234.5,
   276.5,
   318.5,
   226.7,
   268.7,
   310.7,
   352.7,
   260.8,
   302.8,
   344.8,
   386.8,
   295,
   337,
   379,
   421,
   329.2,
   371.2,
   413.2,
   455.2,
   200.1,
   242.1,
   284.1,
   326.1,
   234.2,
   276.2,
   318.2,
   360.2,
   268.4,
   310.4,
   352.4,
   394.4,
   302.6,
   344.6,
   386.6,
   428.6,
   336.7,
   378.7,
   420.7,
   462.7,
   207.6,
   249.6,
   291.6,
   333.6,
   241.8,
   283.8,
   325.8,
   367.8,
   276,
   318,
   360,
   402,
   310.1,
   352.1,
   394.1,
   436.1,
   344.3,
   386.3,
   428.3,
   470.3,
   215.2,
   257.2,
   299.2,
   341.2,
   249.4,
   291.4,
   333.4,
   375.4,
   283.5,
   325.5,
   367.5,
   409.5,
   317.7,
   359.7,
   401.7,
   443.7,
   351.9,
   393.9,
   435.9,
   477.9,
   222.8,
   264.8,
   306.8,
   348.8,
   256.9,
   298.9,
   340.9,
   382.9,
   291.1,
   333.1,
   375.1,
   417.1,
   325.3,
   367.3,
   409.3,
   451.3,
   359.4,
   401.4,
   443.4,
   485.4,
   230.4,
   272.4,
   314.4,
   356.4,
   264.5,
   306.5,
   348.5,
   390.5,
   298.7,
   340.7,
   382.7,
   424.7,
   332.9,
   374.9,
   416.9,
   458.9,
   367,
   409,
   451,
   493,
   237.9,
   279.9,
   321.9,
   363.9,
   272.1,
   314.1,
   356.1,
   398.1,
   306.3,
   348.3,
   390.3,
   432.3,
   340.4,
   382.4,
   424.4,
   466.4,
   374.6,
   416.6,
   458.6,
   500.6,
   245.5,
   287.5,
   329.5,
   371.5,
   279.7,
   321.7,
   363.7,
   405.7,
   313.8,
   355.8,
   397.8,
   439.8,
   348,
   390,
   432,
   474,
   382.2,
   424.2,
   466.2,
   508.2,
   253.1,
   295.1,
   337.1,
   379.1,
   287.2,
   329.2,
   371.2,
   413.2,
   321.4,
   363.4,
   405.4,
   447.4,
   355.6,
   397.6,
   439.6,
   481.6,
   389.7,
   431.7,
   473.7,
   515.7,
   260.6,
   302.6,
   344.6,
   386.6,
   294.8,
   336.8,
   378.8,
   420.8,
   329,
   371,
   413,
   455,
   363.1,
   405.1,
   447.1,
   489.1,
   397.3,
   439.3,
   481.3,
   523.3,
   268.2,
   310.2,
   352.2,
   394.2,
   302.4,
   344.4,
   386.4,
   428.4,
   336.5,
   378.5,
   420.5,
   462.5,
   370.7,
   412.7,
   454.7,
   496.7,
   404.9,
   446.9,
   488.9,
   530.9,
   275.8,
   317.8,
   359.8,
   401.8,
   310,
   352,
   394,
   436,
   344.1,
   386.1,
   428.1,
   470.1,
   378.3,
   420.3,
   462.3,
   504.3,
   412.4,
   454.4,
   496.4,
   538.4,
   283.4,
   325.4,
   367.4,
   409.4,
   317.5,
   359.5,
   401.5,
   443.5,
   351.7,
   393.7,
   435.7,
   477.7,
   385.9,
   427.9,
   469.9,
   511.9,
   420,
   462,
   504,
   546,
   290.9,
   332.9,
   374.9,
   416.9,
   325.1,
   367.1,
   409.1,
   451.1,
   359.3,
   401.3,
   443.3,
   485.3,
   393.4,
   435.4,
   477.4,
   519.4,
   427.6,
   469.6,
   511.6,
   553.6,
   298.5,
   340.5,
   382.5,
   424.5,
   332.7,
   374.7,
   416.7,
   458.7,
   366.8,
   408.8,
   450.8,
   492.8,
   401,
   443,
   485,
   527,
   435.2,
   477.2,
   519.2,
   561.2,
   306.1,
   348.1,
   390.1,
   432.1,
   340.2,
   382.2,
   424.2,
   466.2,
   374.4,
   416.4,
   458.4,
   500.4,
   408.6,
   450.6,
   492.6,
   534.6,
   442.7,
   484.7,
   526.7,
   568.7,
   313.6,
   355.6,
   397.6,
   439.6,
   347.8,
   389.8,
   431.8,
   473.8,
   382,
   424,
   466,
   508,
   416.1,
   458.1,
   500.1,
   542.1,
   450.3,
   492.3,
   534.3,
   576.3,
   321.2,
   363.2,
   405.2,
   447.2,
   355.4,
   397.4,
   439.4,
   481.4,
   389.5,
   431.5,
   473.5,
   515.5,
   423.7,
   465.7,
   507.7,
   549.7,
   457.9,
   499.9,
   541.9,
   583.9
  ],
  "checks": [
   {
    "id": "capacity",
    "label": "Contracted capacity"
   },
   {
    "id": "ess",
    "label": "Battery X MW / 2X MWh usable at the meter"
   },
   {
    "id": "reCod",
    "label": "RE online by month 36"
   },
   {
    "id": "market",
    "label": "Green market within 25% (+75% until month 36)"
   },
   {
    "id": "group",
    "label": "Group RE within 50% after month 36"
   },
   {
    "id": "daily",
    "label": "2 MWh/MW every day"
   },
   {
    "id": "weekly",
    "label": "Weekly shortfall within 10%"
   }
  ]
 },
 "day": {
  "date": "2031-09-29",
  "chosen": [
   19,
   20
  ],
  "delivered": 194,
  "required": 200,
  "availability": 0.97,
  "price": [
   3.65,
   3.18,
   3.06,
   2.69,
   2.38,
   2.03,
   2.22,
   2.08,
   1.83,
   1.81,
   1.8,
   1.78,
   1.8,
   1.35,
   1.83,
   2.28,
   2.87,
   3.57,
   6.24,
   10,
   10,
   6.56,
   4.54,
   4.36
  ],
  "b": {
   "solar": [
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0.03,
    0.07,
    0.1,
    1.83,
    2.42,
    3.01,
    3.6,
    3.95,
    4.5,
    5.05,
    5.6,
    6.44,
    6.89,
    7.34,
    7.79,
    8.02,
    8.26,
    8.5,
    8.73,
    8.82,
    8.96,
    9.1,
    9.23,
    9.35,
    9.44,
    9.53,
    9.62,
    9.76,
    9.76,
    9.76,
    9.76,
    9.31,
    8.86,
    8.41,
    7.97,
    7.07,
    6.49,
    5.91,
    5.33,
    4.89,
    4.29,
    3.7,
    3.11,
    2.22,
    1.72,
    1.22,
    0.72,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ],
   "own": [
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0.03,
    0.07,
    0.1,
    1.83,
    2.42,
    3.01,
    3.6,
    3.95,
    4.5,
    5.05,
    5.6,
    6.44,
    6.89,
    7.34,
    7.79,
    8.02,
    8.26,
    8.5,
    8.73,
    8.82,
    8.96,
    9.1,
    9.23,
    9.35,
    9.44,
    9.53,
    9.62,
    9.76,
    9.76,
    9.76,
    9.76,
    9.31,
    8.86,
    8.41,
    7.97,
    7.07,
    6.49,
    5.91,
    5.33,
    4.89,
    4.29,
    3.7,
    3.11,
    2.22,
    1.72,
    1.22,
    0.72,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ],
   "bought": [
    100,
    100,
    100,
    100,
    51.38,
    51.38,
    51.38,
    51.38,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ],
   "discharge": [
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    97,
    97,
    97,
    97,
    97,
    97,
    97,
    97,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ],
   "soc": [
    10.9,
    21.8,
    32.6,
    43.5,
    49.1,
    54.7,
    60.3,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.8,
    65.9,
    65.9,
    65.9,
    66.1,
    66.3,
    66.7,
    67.1,
    67.5,
    68,
    68.5,
    69.1,
    69.8,
    70.6,
    71.4,
    72.2,
    73.1,
    74,
    74.9,
    75.9,
    76.8,
    77.8,
    78.8,
    79.8,
    80.8,
    81.8,
    82.9,
    83.9,
    85,
    86,
    87.1,
    88.2,
    89.2,
    90.1,
    91.1,
    91.9,
    92.7,
    93.4,
    94,
    94.6,
    95.2,
    95.6,
    96,
    96.4,
    96.6,
    96.8,
    96.9,
    97,
    97,
    97,
    97,
    97,
    84.9,
    72.7,
    60.6,
    48.5,
    36.4,
    24.2,
    12.1,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ],
   "delivered": [
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    97,
    97,
    97,
    97,
    97,
    97,
    97,
    97,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ],
   "stored": [
    21.8,
    43.5,
    65.3,
    87,
    98.2,
    109.3,
    120.5,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    131.7,
    132.1,
    132.7,
    133.3,
    134.1,
    135,
    135.9,
    137,
    138.3,
    139.7,
    141.2,
    142.8,
    144.4,
    146.2,
    148,
    149.8,
    151.7,
    153.7,
    155.6,
    157.6,
    159.6,
    161.6,
    163.7,
    165.7,
    167.8,
    170,
    172.1,
    174.2,
    176.3,
    178.4,
    180.3,
    182.1,
    183.8,
    185.4,
    186.8,
    188.1,
    189.2,
    190.3,
    191.2,
    192,
    192.7,
    193.2,
    193.6,
    193.8,
    194,
    194,
    194,
    194,
    194,
    169.7,
    145.5,
    121.2,
    97,
    72.7,
    48.5,
    24.2,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0,
    0
   ]
  }
 },
 "rows": [
  {
   "year": 1,
   "revenue": 58.9,
   "opex": 23.1,
   "charging": 17.4,
   "debtService": 23.8,
   "tax": 0,
   "fcfe": 4.8,
   "dscr": 1.2,
   "closingDebt": 179.8
  },
  {
   "year": 2,
   "revenue": 59,
   "opex": 21.9,
   "charging": 16,
   "debtService": 28.2,
   "tax": 0,
   "fcfe": 5.6,
   "dscr": 1.2,
   "closingDebt": 167.4
  },
  {
   "year": 3,
   "revenue": 59.1,
   "opex": 19.5,
   "charging": 13.4,
   "debtService": 30.4,
   "tax": 0,
   "fcfe": 6.1,
   "dscr": 1.2,
   "closingDebt": 151.6
  },
  {
   "year": 4,
   "revenue": 59.1,
   "opex": 19.8,
   "charging": 13.4,
   "debtService": 30.3,
   "tax": 0,
   "fcfe": 6.1,
   "dscr": 1.2,
   "closingDebt": 134.6
  },
  {
   "year": 5,
   "revenue": 59.1,
   "opex": 20.1,
   "charging": 13.4,
   "debtService": 30.2,
   "tax": 0,
   "fcfe": 6,
   "dscr": 1.2,
   "closingDebt": 116.2
  },
  {
   "year": 6,
   "revenue": 59.1,
   "opex": 20.4,
   "charging": 13.4,
   "debtService": 30,
   "tax": 0,
   "fcfe": 6,
   "dscr": 1.2,
   "closingDebt": 96.3
  },
  {
   "year": 7,
   "revenue": 59.1,
   "opex": 20.8,
   "charging": 13.5,
   "debtService": 29.8,
   "tax": 0,
   "fcfe": 6,
   "dscr": 1.2,
   "closingDebt": 74.9
  },
  {
   "year": 8,
   "revenue": 59.1,
   "opex": 21.1,
   "charging": 13.5,
   "debtService": 29.7,
   "tax": 0,
   "fcfe": 5.9,
   "dscr": 1.2,
   "closingDebt": 51.8
  },
  {
   "year": 9,
   "revenue": 59.1,
   "opex": 21.5,
   "charging": 13.5,
   "debtService": 29.5,
   "tax": 0,
   "fcfe": 5.9,
   "dscr": 1.2,
   "closingDebt": 26.9
  },
  {
   "year": 10,
   "revenue": 59.1,
   "opex": 21.9,
   "charging": 13.5,
   "debtService": 27.6,
   "tax": 2,
   "fcfe": 5.5,
   "dscr": 1.2,
   "closingDebt": 1.7
  },
  {
   "year": 11,
   "revenue": 59.1,
   "opex": 22.2,
   "charging": 13.6,
   "debtService": 1.8,
   "tax": 8.5,
   "fcfe": 24.4,
   "dscr": null,
   "closingDebt": 0
  },
  {
   "year": 12,
   "revenue": 59.1,
   "opex": 22.7,
   "charging": 13.6,
   "debtService": 0,
   "tax": 8.5,
   "fcfe": 25.9,
   "dscr": null,
   "closingDebt": 0
  },
  {
   "year": 13,
   "revenue": 59.1,
   "opex": 23.1,
   "charging": 13.6,
   "debtService": 0,
   "tax": 8.5,
   "fcfe": 25.6,
   "dscr": null,
   "closingDebt": 0
  },
  {
   "year": 14,
   "revenue": 59.1,
   "opex": 23.6,
   "charging": 13.6,
   "debtService": 0,
   "tax": 8.4,
   "fcfe": 25.3,
   "dscr": null,
   "closingDebt": 0
  },
  {
   "year": 15,
   "revenue": 59.6,
   "opex": 24.3,
   "charging": 13.9,
   "debtService": 0,
   "tax": 8.4,
   "fcfe": 57.4,
   "dscr": null,
   "closingDebt": 0
  }
 ],
 "drivers": [
  {
   "label": "battery's capex",
   "value": 3.15
  },
  {
   "label": "charging power and exchange fees",
   "value": 1.99
  },
  {
   "label": "O&M, insurance, fixed costs and the LC",
   "value": 1.08
  },
  {
   "label": "transmission, SECI's charges and pre-operative cost",
   "value": 0.81
  },
  {
   "label": "own RE capex",
   "value": 0.67
  },
  {
   "label": "augmentation",
   "value": 0.31
  },
  {
   "label": "surplus sales and RECs",
   "value": -0.02
  },
  {
   "label": "tax and the equity return above the discount rate",
   "value": 0.33
  }
 ],
 "levers": [
  {
   "key": "solarMw",
   "label": "Own solar",
   "unit": "MWac",
   "pct": false,
   "value": 10,
   "step": 10,
   "min": 0,
   "max": 5000,
   "up": 8.531,
   "down": 9.501,
   "slope": -0.04850420657424568,
   "perStep": -0.485,
   "operation": true,
   "what": "Your own solar, co-located with the battery. Fill it and charge the battery from it instead of the market.",
   "why": "Own solar replaces bought charging power (about ₹2.2/kWh) and sells its surplus at midday prices, against about ₹4 cr of capex per MWac. The first MW lower the price a lot; past the size that fills the battery the surplus sells for less than it costs, and the price turns up again. This is the lever the optimiser sets."
  },
  {
   "key": "essMwhPerMw",
   "label": "Battery energy",
   "unit": "MWh per contracted MW",
   "pct": false,
   "value": 2,
   "step": 0.05,
   "min": 2,
   "max": 6,
   "up": 8.432,
   "down": 8.322,
   "slope": 2.1961716870490102,
   "perStep": 0.1098,
   "operation": true,
   "what": "Battery energy per contracted MW. The tender needs at least 2 (2 hours at full power).",
   "why": "More than 2 MWh per MW buys headroom for degradation and bad days, but it is capex (about ₹1 cr per MWh) that earns nothing on a normal day, so the price rises. Below 2 is not allowed."
  },
  {
   "key": "extraEssMwhPerMw",
   "label": "Extra battery for evening sale",
   "unit": "MWh per contracted MW",
   "pct": false,
   "value": 0,
   "step": 0.05,
   "min": 0,
   "max": 6,
   "up": 8.432,
   "down": 8.322,
   "slope": 2.1961716870490022,
   "perStep": 0.1098,
   "operation": true,
   "what": "Battery beyond the tender's 2 MWh per MW, kept for selling in the evening hours outside your two peak hours, once the day's commitment is met.",
   "why": "It earns the market price on those evenings (the Pool does not settle it) but costs capex, O&M, augmentation and charging power. It lowers the price only when the evening hours left after your peak pay more than that cost over 15 years."
  },
  {
   "key": "fin.graceYears",
   "label": "Principal moratorium",
   "unit": "years",
   "pct": false,
   "value": 0,
   "step": 1,
   "min": 0,
   "max": 5,
   "up": 8.234,
   "down": 8.322,
   "slope": -0.08841249843528765,
   "perStep": -0.0884,
   "operation": false,
   "what": "Years after the COD in which only interest is paid, no principal (the moratorium).",
   "why": "Later principal means more cash to the equity in the early years, which the IRR values most, so the price falls slightly."
  },
  {
   "key": "essCrPerMwh",
   "label": "Battery capex (all-in)",
   "unit": "₹ cr/MWh",
   "pct": false,
   "value": 0.85,
   "step": 0.01,
   "min": 0,
   "max": 5,
   "up": 8.369,
   "down": 8.276,
   "slope": 4.629832083841552,
   "perStep": 0.0463,
   "operation": false,
   "what": "All-in battery capex per MWh: cells, PCS, civil, EMS, everything up to the pooling station.",
   "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
  },
  {
   "key": "targetEquityIrr",
   "label": "Target equity IRR",
   "unit": "%",
   "pct": true,
   "value": 0.13,
   "step": 0.0025,
   "min": 0,
   "max": 0.4,
   "up": 8.364,
   "down": 8.281,
   "slope": 16.772376068782066,
   "perStep": 0.0419,
   "operation": false,
   "what": "The return your equity asks for, after tax. The strike price is solved so that the equity earns exactly this.",
   "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
  },
  {
   "key": "debtFraction",
   "label": "Debt share",
   "unit": "%",
   "pct": true,
   "value": 0.75,
   "step": 0.01,
   "min": 0,
   "max": 0.95,
   "up": 8.284,
   "down": 8.358,
   "slope": -3.698192529801411,
   "perStep": -0.037,
   "operation": false,
   "what": "The share of the project cost funded by loans; the rest is your equity.",
   "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
  },
  {
   "key": "fin.receivableDays",
   "label": "Receivable days",
   "unit": "days",
   "pct": false,
   "value": 45,
   "step": 15,
   "min": 0,
   "max": 180,
   "up": 8.357,
   "down": 8.288,
   "slope": 0.0023014387476490467,
   "perStep": 0.0345,
   "operation": false,
   "what": "Days between selling the energy and receiving the money, which sets the working capital you must fund.",
   "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
  },
  {
   "key": "availability",
   "label": "Plant availability",
   "unit": "%",
   "pct": true,
   "value": 0.97,
   "step": 0.005,
   "min": 0.5,
   "max": 1,
   "up": 8.294,
   "down": 8.352,
   "slope": -5.794192163958195,
   "perStep": -0.029,
   "operation": true,
   "what": "The share of the daily 2 MWh per MW you expect to deliver, after outages and curtailment.",
   "why": "Energy not delivered earns nothing and, beyond 10% a week, is penalised; so lower availability needs a higher price on the energy you do deliver."
  },
  {
   "key": "preopPct",
   "label": "Pre-operative & IDC",
   "unit": "%",
   "pct": true,
   "value": 0.05,
   "step": 0.005,
   "min": 0,
   "max": 0.3,
   "up": 8.346,
   "down": 8.299,
   "slope": 4.7081337784515425,
   "perStep": 0.0235,
   "operation": false,
   "what": "Pre-operative expenses and interest during construction, as a share of the hard cost.",
   "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
  },
  {
   "key": "evacuationCrPerMw",
   "label": "Transmission to the ISTS substation",
   "unit": "₹ cr per contracted MW",
   "pct": false,
   "value": 0.3,
   "step": 0.01,
   "min": 0,
   "max": 3,
   "up": 8.344,
   "down": 8.301,
   "slope": 2.1221269384764856,
   "perStep": 0.0212,
   "operation": false,
   "what": "The line and bay from the plant to the ISTS substation, per contracted MW.",
   "why": "A fixed cost of the connection; dearer evacuation means a higher price."
  },
  {
   "key": "essOmLakhPerMwh",
   "label": "Battery O&M",
   "unit": "₹ lakh/MWh/yr",
   "pct": false,
   "value": 1.2,
   "step": 0.05,
   "min": 0,
   "max": 10,
   "up": 8.341,
   "down": 8.304,
   "slope": 0.3759568490296413,
   "perStep": 0.0188,
   "operation": false,
   "what": "Battery operation and maintenance per MWh a year.",
   "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
  }
 ],
 "tracks": {
  "targets": [
   8,
   7.75,
   7.5
  ],
  "plans": {
   "8.00|": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.998,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.78,
      "p": 1,
      "price": 7.998,
      "drop": 0.324,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     }
    ]
   },
   "8.00|essCrPerMwh": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.989,
    "steps": [
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8.216,
      "drop": 0.106,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.122,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.076,
      "drop": 0.046,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.039,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.005,
      "drop": 0.033,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 7.989,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     }
    ]
   },
   "8.00|essCrPerMwh,evacuationCrPerMw": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.998,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.144,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.11,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.084,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.054,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.032,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.015,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 7.998,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     }
    ]
   },
   "8.00|essCrPerMwh,otherFixedLakhPerMw": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 8.002,
    "steps": [
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8.216,
      "drop": 0.106,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.17,
      "drop": 0.046,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.133,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.099,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.073,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.043,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.019,
      "drop": 0.024,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.002,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     }
    ]
   },
   "8.00|essCrPerMwh,preopPct": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.993,
    "steps": [
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8.216,
      "drop": 0.106,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.122,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.085,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.051,
      "drop": 0.033,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.021,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.004,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.0475,
      "p": 1,
      "price": 7.993,
      "drop": 0.011,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     }
    ]
   },
   "8.00|essCrPerMwh,essOmLakhPerMwh": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.996,
    "steps": [
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8.216,
      "drop": 0.106,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.122,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.076,
      "drop": 0.046,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.043,
      "drop": 0.033,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.012,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 7.996,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     }
    ]
   },
   "7.75|": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.721,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.72,
      "p": 1,
      "price": 7.721,
      "drop": 0.602,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     }
    ]
   },
   "7.75|essCrPerMwh": {
    "reached": true,
    "chance": 0.765,
    "floor": null,
    "final": 7.73,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.144,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.11,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.084,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.054,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.032,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.007,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 7.989,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 7.972,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.954,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.944,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.939,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.935,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.933,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.933,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.76,
      "p": 0.9,
      "price": 7.895,
      "drop": 0.038,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.21999999999999997,
      "p": 0.85,
      "price": 7.73,
      "drop": 0.166,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.75|essCrPerMwh,otherFixedLakhPerMw": {
    "reached": true,
    "chance": 0.6,
    "floor": null,
    "final": 7.744,
    "steps": [
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.275,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.238,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.204,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.178,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.148,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.123,
      "drop": 0.024,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.098,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.08,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.063,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8.044,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 8.035,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 8.03,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 8.026,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 8.024,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 8.024,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.77,
      "p": 0.8,
      "price": 7.949,
      "drop": 0.075,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.19999999999999998,
      "p": 0.75,
      "price": 7.744,
      "drop": 0.206,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.75|essCrPerMwh,preopPct": {
    "reached": true,
    "chance": 0.72,
    "floor": null,
    "final": 7.754,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.191,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.157,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.131,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.101,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.079,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.054,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.036,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.019,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.991,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.986,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.982,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.98,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.98,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.76,
      "p": 0.9,
      "price": 7.942,
      "drop": 0.038,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.21,
      "p": 0.8,
      "price": 7.754,
      "drop": 0.188,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.75|essCrPerMwh,essOmLakhPerMwh": {
    "reached": true,
    "chance": 0.72,
    "floor": null,
    "final": 7.745,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.148,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.122,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.092,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.069,
      "drop": 0.023,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.043,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.025,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.008,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.99,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.981,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.975,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.971,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.97,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.969,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.76,
      "p": 0.9,
      "price": 7.932,
      "drop": 0.038,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.21,
      "p": 0.8,
      "price": 7.745,
      "drop": 0.186,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.75|essCrPerMwh,fin.receivableDays": {
    "reached": true,
    "chance": 0.72,
    "floor": null,
    "final": 7.741,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.144,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.118,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.088,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.066,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.04,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.022,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.005,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.987,
      "drop": 0.019,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.977,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.972,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.968,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.966,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.966,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.76,
      "p": 0.9,
      "price": 7.928,
      "drop": 0.038,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.21,
      "p": 0.8,
      "price": 7.741,
      "drop": 0.187,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.50|": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.492,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.27,
      "p": 1,
      "price": 7.564,
      "drop": 0.064,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 7.524,
      "drop": 0.041,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 7.492,
      "drop": 0.031,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     }
    ]
   },
   "7.50|essCrPerMwh": {
    "reached": true,
    "chance": 0.315,
    "floor": null,
    "final": 7.487,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.144,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.11,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.084,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.054,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.032,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.007,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 7.989,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 7.972,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.954,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.944,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.939,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.935,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.933,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.933,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "targetEquityIrr",
      "label": "Target equity IRR",
      "unit": "%",
      "pct": true,
      "from": 0.13,
      "to": 0.125,
      "p": 0.75,
      "price": 7.852,
      "drop": 0.081,
      "who": "your board",
      "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.78,
      "p": 0.7,
      "price": 7.748,
      "drop": 0.104,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.16999999999999998,
      "p": 0.6,
      "price": 7.487,
      "drop": 0.261,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.50|evacuationCrPerMw": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.499,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 7.587,
      "drop": 0.041,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 7.549,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 7.518,
      "drop": 0.031,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.9,
      "p": 1,
      "price": 7.499,
      "drop": 0.019,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     }
    ]
   },
   "7.50|preopPct": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.491,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.522,
      "drop": 0.106,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 7.491,
      "drop": 0.031,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     }
    ]
   },
   "7.50|fin.receivableDays": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.503,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.26,
      "p": 1,
      "price": 7.543,
      "drop": 0.085,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 7.503,
      "drop": 0.04,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     }
    ]
   },
   "7.50|essCrPerMwh,otherFixedLakhPerMw": {
    "reached": true,
    "chance": 0.206,
    "floor": null,
    "final": 7.492,
    "steps": [
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.275,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.238,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.204,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.178,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.148,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.123,
      "drop": 0.024,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.098,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.08,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.063,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8.044,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 8.035,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 8.03,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 8.026,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 8.024,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 8.024,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "targetEquityIrr",
      "label": "Target equity IRR",
      "unit": "%",
      "pct": true,
      "from": 0.13,
      "to": 0.1225,
      "p": 0.625,
      "price": 7.904,
      "drop": 0.12,
      "who": "your board",
      "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.79,
      "p": 0.6,
      "price": 7.77,
      "drop": 0.134,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.15999999999999998,
      "p": 0.55,
      "price": 7.492,
      "drop": 0.277,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.50|essCrPerMwh,preopPct": {
    "reached": true,
    "chance": 0.27,
    "floor": null,
    "final": 7.494,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.191,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.157,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.131,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.101,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.079,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.054,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.036,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.019,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 8,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.991,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.986,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.982,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.98,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.98,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "targetEquityIrr",
      "label": "Target equity IRR",
      "unit": "%",
      "pct": true,
      "from": 0.13,
      "to": 0.125,
      "p": 0.75,
      "price": 7.898,
      "drop": 0.082,
      "who": "your board",
      "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.79,
      "p": 0.6,
      "price": 7.756,
      "drop": 0.142,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.16999999999999998,
      "p": 0.6,
      "price": 7.494,
      "drop": 0.262,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.50|essCrPerMwh,essOmLakhPerMwh": {
    "reached": true,
    "chance": 0.27,
    "floor": null,
    "final": 7.488,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.148,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.122,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.092,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.069,
      "drop": 0.023,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.043,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.025,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.008,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.99,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.981,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.975,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.971,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.97,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.969,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "targetEquityIrr",
      "label": "Target equity IRR",
      "unit": "%",
      "pct": true,
      "from": 0.13,
      "to": 0.125,
      "p": 0.75,
      "price": 7.888,
      "drop": 0.081,
      "who": "your board",
      "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.79,
      "p": 0.6,
      "price": 7.748,
      "drop": 0.141,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.16999999999999998,
      "p": 0.6,
      "price": 7.488,
      "drop": 0.259,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.50|essCrPerMwh,fin.receivableDays": {
    "reached": true,
    "chance": 0.27,
    "floor": null,
    "final": 7.481,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.144,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.118,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.088,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.066,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.04,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 8.022,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 8.005,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.987,
      "drop": 0.019,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.977,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.972,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.968,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.966,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.966,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "targetEquityIrr",
      "label": "Target equity IRR",
      "unit": "%",
      "pct": true,
      "from": 0.13,
      "to": 0.125,
      "p": 0.75,
      "price": 7.884,
      "drop": 0.082,
      "who": "your board",
      "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.79,
      "p": 0.6,
      "price": 7.741,
      "drop": 0.142,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.16999999999999998,
      "p": 0.6,
      "price": 7.481,
      "drop": 0.26,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     }
    ]
   },
   "7.50|essCrPerMwh,evacuationCrPerMw": {
    "reached": true,
    "chance": 0.151,
    "floor": null,
    "final": 7.492,
    "steps": [
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.5,
      "p": 1,
      "price": 8.228,
      "drop": 0.094,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 8.181,
      "drop": 0.047,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 8.144,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 8.11,
      "drop": 0.034,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     },
     {
      "key": "reCodMonths",
      "label": "RE generation commissioned",
      "unit": "months after the SCD",
      "pct": false,
      "from": 21,
      "to": 18,
      "p": 1,
      "price": 8.084,
      "drop": 0.026,
      "who": "your construction plan",
      "why": "Every month without own RE, the battery is charged entirely from the market at about ₹2.2/kWh; earlier RE replaces that cost sooner, so the price falls."
     },
     {
      "key": "rte",
      "label": "Battery round-trip efficiency (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.87,
      "to": 0.88,
      "p": 1,
      "price": 8.054,
      "drop": 0.03,
      "who": "the battery supplier",
      "why": "At 87% you buy or generate 1.15 units for every unit sold; a better battery needs less charging power, so the price falls."
     },
     {
      "key": "omEscalation",
      "label": "O&M escalation",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.045000000000000005,
      "p": 1,
      "price": 8.032,
      "drop": 0.022,
      "who": "the O&M contract",
      "why": "The revenue is fixed at the strike price for 15 years, so costs that rise faster need a higher price from day one."
     },
     {
      "key": "solarCuf",
      "label": "Solar CUF (AC)",
      "unit": "%",
      "pct": true,
      "from": 0.25,
      "to": 0.26,
      "p": 1,
      "price": 8.007,
      "drop": 0.026,
      "who": "the site you pick",
      "why": "A better site makes more energy from the same capex: more free charging and more surplus to sell, so the price falls."
     },
     {
      "key": "augDecline",
      "label": "Battery price fall (augmentation)",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.060000000000000005,
      "p": 1,
      "price": 7.989,
      "drop": 0.018,
      "who": "the battery market",
      "why": "Faster falling prices make the later top-ups cheaper, so the price falls a little."
     },
     {
      "key": "insurancePct",
      "label": "Insurance",
      "unit": "%",
      "pct": true,
      "from": 0.003,
      "to": 0.0025,
      "p": 1,
      "price": 7.972,
      "drop": 0.017,
      "who": "the insurer",
      "why": "A yearly cost on the whole project; higher means a higher price."
     },
     {
      "key": "marketCharges",
      "label": "Charges on green-market power",
      "unit": "₹/kWh",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.954,
      "drop": 0.018,
      "who": "the exchange and the ISTS waiver",
      "why": "It is paid on every unit bought for charging, all of it in the first years and a quarter later; higher charges mean dearer charging, so the price rises."
     },
     {
      "key": "solarOmLakhPerMw",
      "label": "Solar O&M",
      "unit": "₹ lakh/MW/yr",
      "pct": false,
      "from": 4,
      "to": 3.5,
      "p": 1,
      "price": 7.944,
      "drop": 0.009,
      "who": "the O&M contract",
      "why": "A yearly cost on the own solar; higher O&M, higher price, in proportion to the solar in the bid."
     },
     {
      "key": "recPrice",
      "label": "REC price",
      "unit": "₹/REC (MWh)",
      "pct": false,
      "from": 150,
      "to": 200,
      "p": 1,
      "price": 7.939,
      "drop": 0.006,
      "who": "the REC market",
      "why": "Extra income on the energy sold, so a higher REC price lowers the strike price a little."
     },
     {
      "key": "solarDegradation",
      "label": "Solar degradation",
      "unit": "%",
      "pct": true,
      "from": 0.005,
      "to": 0.004,
      "p": 1,
      "price": 7.935,
      "drop": 0.004,
      "who": "the module warranty",
      "why": "Faster degradation means less own energy in the later years, more bought power and less surplus sold, so the price rises slightly."
     },
     {
      "key": "pbgCostPct",
      "label": "Bank guarantee cost (EMD, PBG)",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.933,
      "drop": 0.001,
      "who": "your bank",
      "why": "A small cost before and around the SCD; a small lever."
     },
     {
      "key": "lcCostPct",
      "label": "Letter of Credit cost",
      "unit": "%",
      "pct": true,
      "from": 0.01,
      "to": 0.008,
      "p": 1,
      "price": 7.933,
      "drop": 0,
      "who": "your bank",
      "why": "The LC is larger the lower your strike price; its cost is small, so this lever barely moves the price."
     },
     {
      "key": "interestRate",
      "label": "Interest rate",
      "unit": "%",
      "pct": true,
      "from": 0.0875,
      "to": 0.086,
      "p": 0.9,
      "price": 7.913,
      "drop": 0.02,
      "who": "the lender",
      "why": "Paid on about three quarters of the project cost for the tenor; a cheaper loan lowers the price."
     },
     {
      "key": "debtFraction",
      "label": "Debt share",
      "unit": "%",
      "pct": true,
      "from": 0.75,
      "to": 0.81,
      "p": 0.42,
      "price": 7.666,
      "drop": 0.246,
      "who": "the lender (DSCR permitting)",
      "why": "Debt at 9% is cheaper than equity at 14%, so more debt lowers the price, until the DSCR falls below what the lender accepts."
     },
     {
      "key": "targetEquityIrr",
      "label": "Target equity IRR",
      "unit": "%",
      "pct": true,
      "from": 0.13,
      "to": 0.115,
      "p": 0.4,
      "price": 7.492,
      "drop": 0.174,
      "who": "your board",
      "why": "The price is the direct answer to this number: a higher target needs a higher price. If you can live with a lower return, this is the cheapest rupee to find on bid day."
     }
    ]
   },
   "7.50|evacuationCrPerMw,preopPct": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.503,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.7,
      "p": 1,
      "price": 7.572,
      "drop": 0.056,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 7.534,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 7.503,
      "drop": 0.031,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     }
    ]
   },
   "7.50|essOmLakhPerMwh,evacuationCrPerMw": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.499,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.7,
      "p": 1,
      "price": 7.572,
      "drop": 0.056,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 7.53,
      "drop": 0.041,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "fin.receivableDays",
      "label": "Receivable days",
      "unit": "days",
      "pct": false,
      "from": 45,
      "to": 30,
      "p": 1,
      "price": 7.499,
      "drop": 0.031,
      "who": "the exchange's settlement cycle",
      "why": "More days tie up more cash at the working-capital interest rate, so the price rises a little."
     }
    ]
   },
   "7.50|evacuationCrPerMw,fin.receivableDays": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.493,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "otherFixedLakhPerMw",
      "label": "Scheduling, forecasting, fees, admin",
      "unit": "₹ lakh per contracted MW/yr",
      "pct": false,
      "from": 2,
      "to": 1.7,
      "p": 1,
      "price": 7.572,
      "drop": 0.056,
      "who": "your overheads",
      "why": "A yearly fixed cost over the term; higher means a higher price."
     },
     {
      "key": "preopPct",
      "label": "Pre-operative & IDC",
      "unit": "%",
      "pct": true,
      "from": 0.05,
      "to": 0.04,
      "p": 1,
      "price": 7.53,
      "drop": 0.041,
      "who": "your construction schedule and drawdown",
      "why": "Added to the project cost before a unit is sold, so a higher share means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 7.493,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     }
    ]
   },
   "7.50|fin.receivableDays,preopPct": {
    "reached": true,
    "chance": 1,
    "floor": null,
    "final": 7.484,
    "steps": [
     {
      "key": "essCrPerMwh",
      "label": "Battery capex (all-in)",
      "unit": "₹ cr/MWh",
      "pct": false,
      "from": 0.85,
      "to": 0.7,
      "p": 1,
      "price": 7.628,
      "drop": 0.694,
      "who": "the battery supplier, for 2028 delivery",
      "why": "The largest single cost of the bid: 200 MWh at ₹1 cr is ₹200 cr of the project. Every ₹0.01 cr per MWh is ₹2 cr of capex to recover over 15 years, so the price moves almost one to one with it."
     },
     {
      "key": "evacuationCrPerMw",
      "label": "Transmission to the ISTS substation",
      "unit": "₹ cr per contracted MW",
      "pct": false,
      "from": 0.3,
      "to": 0.25,
      "p": 1,
      "price": 7.522,
      "drop": 0.106,
      "who": "the distance to the substation",
      "why": "A fixed cost of the connection; dearer evacuation means a higher price."
     },
     {
      "key": "essOmLakhPerMwh",
      "label": "Battery O&M",
      "unit": "₹ lakh/MWh/yr",
      "pct": false,
      "from": 1.2,
      "to": 1.0999999999999999,
      "p": 1,
      "price": 7.484,
      "drop": 0.038,
      "who": "the O&M contract",
      "why": "A yearly cost on the whole battery for 15 years; higher O&M, higher price."
     }
    ]
   }
  },
  "depth": 2,
  "fan": 4
 },
 "evening": {
  "chosen": 8.3,
  "all": 6.73
 },
 "pool": [
  {
   "sp": 5.5,
   "cr": -98.7,
   "yours": false
  },
  {
   "sp": 6,
   "cr": -81.1,
   "yours": false
  },
  {
   "sp": 6.5,
   "cr": -63.5,
   "yours": false
  },
  {
   "sp": 7,
   "cr": -45.9,
   "yours": false
  },
  {
   "sp": 7.5,
   "cr": -28.3,
   "yours": false
  },
  {
   "sp": 8,
   "cr": -10.7,
   "yours": false
  },
  {
   "sp": 8.32,
   "cr": 0.7,
   "yours": true
  },
  {
   "sp": 8.5,
   "cr": 7,
   "yours": false
  },
  {
   "sp": 9,
   "cr": 24.6,
   "yours": false
  },
  {
   "sp": 9.5,
   "cr": 42.2,
   "yours": false
  },
  {
   "sp": 10,
   "cr": 59.8,
   "yours": false
  }
 ],
 "verdict": {
  "tone": "good",
  "text": "At ₹8.33 the quote sits at the evening market (₹8.30 in the two chosen hours): the Pool is about neutral on your 100 MW (₹0.2 cr a year paid), so the corpus carries the full 500 MW at the price year's prices; on a lower evening view SECI would weigh the gap."
 },
 "risks": [
  {
   "id": "dsm",
   "title": "Deviation settlement (DSM): about ₹0.2 cr a year"
  },
  {
   "id": "availability",
   "title": "Availability: each 1% below the declaration costs ₹0.61 cr a year of revenue"
  },
  {
   "id": "designated",
   "title": "SECI-designated hours: the two hours you would choose pay ₹8.30/kWh, the evening on average ₹6.73"
  },
  {
   "id": "fees",
   "title": "Exchange, transaction and scheduling charges: ₹0.14 cr a year at ₹0.02/kWh"
  },
  {
   "id": "weekly",
   "title": "Weekly shortfall penalty: 1.5 × (₹10.00 − ₹8.32) on energy beyond 10% short"
  },
  {
   "id": "award",
   "title": "A part award, or none: SECI sizes the award to the corpus at the discovered tariff"
  },
  {
   "id": "market",
   "title": "Not yours: the evening price over 15 years"
  }
 ],
 "checks": {
  "win": [
   {
    "id": "capacity",
    "label": "Contracted capacity",
    "status": "met",
    "detail": "100 MW; 50 to 150 MW in whole MW"
   },
   {
    "id": "ess",
    "label": "Battery X MW / 2X MWh usable at the meter",
    "status": "met",
    "detail": "100 MW / 200 MWh nameplate for 100 MW; augmentation keeps the usable energy every year"
   },
   {
    "id": "reCod",
    "label": "RE online by month 36",
    "status": "met",
    "detail": "21 months after the SCD (01 Feb 2030); at most 21"
   },
   {
    "id": "market",
    "label": "Green market within 25% (+75% until month 36)",
    "status": "met",
    "detail": "highest after month 36: 25.0%"
   },
   {
    "id": "group",
    "label": "Group RE within 50% after month 36",
    "status": "met",
    "detail": "highest: 49.9%"
   },
   {
    "id": "daily",
    "label": "2 MWh/MW every day",
    "status": "met",
    "detail": "every day; 97.0% of the mandate supplied"
   },
   {
    "id": "weekly",
    "label": "Weekly shortfall within 10%",
    "status": "met",
    "detail": "no week below 90% of 14 MWh/MW"
   }
  ],
  "over": [
   {
    "id": "capacity",
    "label": "Contracted capacity",
    "status": "met",
    "detail": "150 MW; 50 to 150 MW in whole MW"
   },
   {
    "id": "ess",
    "label": "Battery X MW / 2X MWh usable at the meter",
    "status": "met",
    "detail": "150 MW / 300 MWh nameplate for 150 MW; augmentation keeps the usable energy every year"
   },
   {
    "id": "reCod",
    "label": "RE online by month 36",
    "status": "met",
    "detail": "21 months after the SCD (01 Feb 2030); at most 21"
   },
   {
    "id": "market",
    "label": "Green market within 25% (+75% until month 36)",
    "status": "failed",
    "detail": "highest after month 36: 51.6%"
   },
   {
    "id": "group",
    "label": "Group RE within 50% after month 36",
    "status": "met",
    "detail": "highest: 0.0%"
   },
   {
    "id": "daily",
    "label": "2 MWh/MW every day",
    "status": "failed",
    "detail": "3,254 days short (53.5% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty"
   },
   {
    "id": "weekly",
    "label": "Weekly shortfall within 10%",
    "status": "info",
    "detail": "478 weeks penalised at 1.5 × (highest evening MCP − SP)"
   }
  ]
 },
 "review": {
  "winning": {
   "tariff": 8.32,
   "summary": "nothing blocking, 1 that carries cost, 4 to note.",
   "findings": [
    {
     "id": "price-market",
     "severity": "warn",
     "title": "₹8.32/kWh is above the highest FDRE peak-power award (₹6.00)",
     "detail": "Assured peak supply, 6000 MWh: ₹5.99–6.00/kWh for 4 hours a day over 25 years. A 2-hour CfD can sit above it, but the gap is what the auction will test.",
     "step": "reference"
    },
    {
     "id": "bought-charging-is-right",
     "severity": "note",
     "title": "Buying the charging power is the right call here: more own solar would raise the price",
     "detail": "₹209 cr of charging power over the term, mostly group RE at ₹2.50/kWh; own solar at ₹3.60 cr/MWac costs more per unit charged. The price is carried by the battery and the financing, not the sourcing.",
     "step": "size"
    },
    {
     "id": "price-drivers",
     "severity": "note",
     "title": "What carries the ₹8.32: the battery's capex ₹3.15/kWh, then charging power and exchange fees ₹1.99",
     "detail": "Capex annualised at 10% over 15 years, costs averaged over the term, all over the energy supplied (70.8 GWh a year): the battery's capex ₹3.15; charging power and exchange fees ₹1.99; O&M, insurance, fixed costs and the LC ₹1.08; transmission, SECI's charges and pre-operative cost ₹0.81; own RE capex ₹0.67; augmentation ₹0.31; less surplus sales and RECs ₹0.02; the rest, ₹0.33, is tax and the return above the discount rate (the 13.0% equity target on 25% equity at 8.75% debt). The biggest line is where the price moves most.",
     "step": "whatif"
    },
    {
     "id": "market-near-cap",
     "severity": "note",
     "title": "Green-market charging reaches 25.0% of the supply after month 36 (limit 25%)",
     "detail": "Close to the cap, a dear day or a thin GDAM leaves the battery short. More own RE, or group RE within its 50% limit, gives room.",
     "step": "size"
    },
    {
     "id": "inputs-below-benchmark",
     "severity": "note",
     "title": "4 inputs far from the benchmark in the direction that lowers the price",
     "detail": "Group-company RE price: 2.50 ₹/kWh against 3.00; Charges on group-company power: 0.00 ₹/kWh against 0.30; Battery capex (all-in): 0.85 ₹ cr/MWh against 1.00; Loan tenor: 15 years against 12. A lender or SECI's evaluators will ask for the evidence behind these.",
     "step": "whatif"
    }
   ]
  },
  "overbuilt": {
   "tariff": 19.92,
   "summary": "4 blocking findings, 5 that carry cost, 4 to note.",
   "findings": [
    {
     "id": "tender-market",
     "severity": "block",
     "title": "Tender condition not met: Green market within 25% (+75% until month 36)",
     "detail": "highest after month 36: 51.6%",
     "step": "size"
    },
    {
     "id": "tender-daily",
     "severity": "block",
     "title": "Tender condition not met: 2 MWh/MW every day",
     "detail": "3,254 days short (53.5% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty",
     "step": "size"
    },
    {
     "id": "tender-weekly",
     "severity": "note",
     "title": "Tender condition to watch: Weekly shortfall within 10%",
     "detail": "478 weeks penalised at 1.5 × (highest evening MCP − SP)",
     "step": "size"
    },
    {
     "id": "price-market",
     "severity": "block",
     "title": "A strike price of ₹19.92/kWh is 3.3× the highest FDRE peak-power award",
     "detail": "Assured peak supply, 6000 MWh awarded ₹5.99–6.00/kWh for 4 hours of assured evening supply over 25 years. The CfD asks 2 hours for 15 years and pays through the market, so a quote far above those awards will not clear the auction. Find what carries the price in the findings below, then size again.",
     "step": "reference"
    },
    {
     "id": "corpus-cap",
     "severity": "note",
     "title": "At ₹19.92 the Pool pays about ₹62 cr a year for your 150 MW; the full 500 MW would need ₹206 cr a year against a ₹76 cr corpus",
     "detail": "Amendment-04 (RfS 42.2.b) lets SECI restrict the capacity awarded to what the CfD corpus can carry at the discovered tariff. The Pool's pay-out is the strike price less the evening market price on every kWh settled (₹8.70/kWh average MCP in your two best evening hours at the price year); the lower the strike price, the more of the 500 MW SECI can afford to award. A bid near the market price needs little from the Pool and is the one most likely to be awarded in full.",
     "step": "reference"
    },
    {
     "id": "solar-not-optimised",
     "severity": "warn",
     "title": "Own solar is not at its best: 29 MWac instead of 14 lowers the screening price by ₹3.970/kWh",
     "detail": "The own-RE size was a first guess, not the optimiser's for these inputs. Run Optimise own RE on the Size step: it tries every size and keeps the one with the least strike price with every day met. Charging bought over the term: ₹117 cr.",
     "step": "size"
    },
    {
     "id": "little-own-re",
     "severity": "warn",
     "title": "Little own RE (14 MWac for 150 MW): nearly all charging power is bought",
     "detail": "₹117 cr of charging power over the term at the green-market and group prices. Own solar charges the battery at what the plant costs you (about ₹2.2/kWh on the benchmarks) and sells its surplus; the optimiser finds the size where that beats buying.",
     "step": "size"
    },
    {
     "id": "price-drivers",
     "severity": "note",
     "title": "What carries the ₹19.92: the battery's capex ₹12.11/kWh, then O&M, insurance, fixed costs and the LC ₹2.53",
     "detail": "Capex annualised at 10% over 15 years, costs averaged over the term, all over the energy supplied (58.6 GWh a year): the battery's capex ₹12.11; O&M, insurance, fixed costs and the LC ₹2.53; transmission, SECI's charges and pre-operative cost ₹1.79; charging power and exchange fees ₹1.35; own RE capex ₹1.26; augmentation ₹1.20; less surplus sales and RECs ₹0.03; the rest, ₹-0.29, is tax and the return above the discount rate (the 16.0% equity target on 25% equity at 9.00% debt). The biggest line is where the price moves most.",
     "step": "whatif"
    },
    {
     "id": "extra-battery",
     "severity": "warn",
     "title": "The extra battery for evening sale (1.00 MWh/MW, 150 MWh) costs ₹25.5 cr a year and earns ₹0.0 cr",
     "detail": "₹180 cr of capex annualised at 10% over 15 years plus O&M, against its evening sales net of charging (average over the term: 0.0 GWh a year). It sells only once the day's commitment is met and within what the green-market limit leaves, which here is little. Set it to 0 unless the evening prices justify it.",
     "step": "bid"
    },
    {
     "id": "battery-fade",
     "severity": "warn",
     "title": "The battery fades below the need: the last year supplies 43.7% of the mandate",
     "detail": "Augmentation is \"annual\" with 2.0% a year of fade; from operating year 2 the usable energy no longer covers 2 MWh per MW. Augment every year, add years to the schedule, or size the nameplate for the last year. At a strike price above the evening market the weekly penalty is nil, but the energy not supplied earns nothing and the price must rise to pay the plant.",
     "step": "financeInputs"
    },
    {
     "id": "inputs-above-benchmark",
     "severity": "warn",
     "title": "1 input far from the benchmark in the direction that raises the price",
     "detail": "Battery capex (all-in): 1.20 ₹ cr/MWh against 1.00 (+20%). Each is yours to set; the What-if step says what each is worth on the price. Keep the ones you have evidence for and freeze them there.",
     "step": "whatif"
    },
    {
     "id": "dscr-below-lender",
     "severity": "block",
     "title": "Minimum DSCR 1.02× is below the lender's 1.10×",
     "detail": "The debt as structured does not finance in its weakest year. Sculpt the repayment to the lender's DSCR (Finance inputs › Repayment), take less debt or a longer tenor, or accept a higher price; the lender's minimum is 1.10× and the model's lowest year gives 1.02×.",
     "step": "financeInputs"
    },
    {
     "id": "high-equity-target",
     "severity": "note",
     "title": "A 16.0% equity IRR target is high for a contracted supply",
     "detail": "SECI's recent awards price at 13–15% equity returns; every point of equity IRR is on the strike price. The benchmark is 14%.",
     "step": "financeInputs"
    }
   ],
   "checks": [
    {
     "id": "capacity",
     "label": "Contracted capacity",
     "status": "met",
     "detail": "150 MW; 50 to 150 MW in whole MW"
    },
    {
     "id": "ess",
     "label": "Battery X MW / 2X MWh usable at the meter",
     "status": "met",
     "detail": "150 MW / 300 MWh nameplate for 150 MW; augmentation keeps the usable energy every year"
    },
    {
     "id": "reCod",
     "label": "RE online by month 36",
     "status": "met",
     "detail": "21 months after the SCD (01 Feb 2030); at most 21"
    },
    {
     "id": "market",
     "label": "Green market within 25% (+75% until month 36)",
     "status": "failed",
     "detail": "highest after month 36: 51.6%"
    },
    {
     "id": "group",
     "label": "Group RE within 50% after month 36",
     "status": "met",
     "detail": "highest: 0.0%"
    },
    {
     "id": "daily",
     "label": "2 MWh/MW every day",
     "status": "failed",
     "detail": "3,254 days short (53.5% of the mandate supplied): more own RE or charging power within the limits, or more battery or augmentation if the battery has faded; or set the policy to pay the penalty"
    },
    {
     "id": "weekly",
     "label": "Weekly shortfall within 10%",
     "status": "info",
     "detail": "478 weeks penalised at 1.5 × (highest evening MCP − SP)"
    }
   ]
  }
 },
 "comps": [
  {
   "code": "SECI-FDRE-IX",
   "product": "FDRE peak power",
   "lo": 5.99,
   "hi": 6,
   "date": "2026-08-21",
   "buys": "4 h of assured peak supply a day"
  },
  {
   "code": "SECI-FDRE-RTC-V",
   "product": "FDRE-RTC",
   "lo": 5.25,
   "hi": 5.26,
   "date": "2026-08-06",
   "buys": "firm supply round the clock"
  },
  {
   "code": "SECI-Tranche-XX",
   "product": "Wind",
   "lo": 3.78,
   "hi": 3.85,
   "date": "2026-07-15",
   "buys": "wind energy as generated"
  },
  {
   "code": "SECI-FDRE-VII",
   "product": "FDRE peak power",
   "lo": 6.27,
   "hi": 6.28,
   "date": "2026-02-05",
   "buys": "4 h of assured peak supply a day"
  },
  {
   "code": "SECI-Tranche-XIX",
   "product": "Wind",
   "lo": 3.67,
   "hi": 3.69,
   "date": "2026-02-04",
   "buys": "wind energy as generated"
  },
  {
   "code": "SECI-ISTS-XXI",
   "product": "Solar + ESS",
   "lo": 3.12,
   "hi": 3.13,
   "date": "2026-01-09",
   "buys": "solar with storage"
  },
  {
   "code": "SECI-ISTS-XX",
   "product": "Solar + ESS",
   "lo": 2.86,
   "hi": 2.87,
   "date": "2025-10-15",
   "buys": "solar with storage"
  },
  {
   "code": "SECI-RTC-IV",
   "product": "RTC (round-the-clock RE)",
   "lo": 5.06,
   "hi": 5.07,
   "date": "2025-05-26",
   "buys": "round-the-clock RE"
  }
 ],
 "rtc": {
  "result": {
   "rfsNo": "SECI/C&P/IPP/13/0020/25-26",
   "name": "SECI-FDRE-RTC-V (this tender, renamed by Amendment-03)",
   "auction": "e-reverse auction 06.08.2026",
   "winners": "₹5.25–5.26 (seven bidders, 1,000 MW); NTPC at ₹5.39",
   "firstRound": "₹6.26–6.99 in the sealed financial bids (median about ₹6.48); the e-RA took ₹1.0–1.2 off",
   "source": "https://www.seci.co.in/uploads/tenders/bidders/SECI_FDRE-RTC-V-_1000_MW_result_website_upload.pdf"
  },
  "bridge": [
   {
    "id": "base",
    "label": "Benchmark inputs, the terms before Amendment-03",
    "tariff": 6.5,
    "kind": "run",
    "plant": {
     "solar": 2.16,
     "wind": 1.56,
     "bess": 1.49,
     "bessMwh": 5.93
    }
   },
   {
    "id": "amd3",
    "label": "Amendment-03's supply profile",
    "tariff": 7.46,
    "kind": "run",
    "plant": {
     "solar": 2.22,
     "wind": 1.19,
     "bess": 2.16,
     "bessMwh": 8.62
    }
   },
   {
    "id": "green",
    "label": "+ 5% bought on the green market",
    "tariff": 6.9,
    "kind": "run",
    "plant": {
     "solar": 1.98,
     "wind": 1.32,
     "bess": 1.87,
     "bessMwh": 7.47
    }
   },
   {
    "id": "bess",
    "label": "+ battery at ₹0.85 cr/MWh, 89% round trip",
    "tariff": 6.06,
    "kind": "estimate",
    "plant": {
     "solar": 2.28,
     "wind": 0.89,
     "bess": 2.28,
     "bessMwh": 9.13
    }
   },
   {
    "id": "sell",
    "label": "+ sell the Solar Hours surplus",
    "tariff": 5.8,
    "kind": "run",
    "plant": {
     "solar": 2.32,
     "wind": 1,
     "bess": 2.16,
     "bessMwh": 8.66
    }
   },
   {
    "id": "finance",
    "label": "+ debt at 8.5% for 18 years, equity IRR 12%",
    "tariff": 5.24,
    "kind": "estimate",
    "plant": {
     "solar": 2.34,
     "wind": 1.01,
     "bess": 2.16,
     "bessMwh": 8.62
    }
   },
   {
    "id": "wind",
    "label": "+ new-generation wind, CUF 37%",
    "tariff": 5.14,
    "kind": "estimate",
    "plant": {
     "solar": 2.26,
     "wind": 0.98,
     "bess": 2.09,
     "bessMwh": 8.36
    }
   }
  ]
 },
 "bess": {
  "req": {
   "powerMw": 250,
   "energyMwh": 500,
   "cyclesPerDay": 2,
   "annualCycles": 730,
   "minRte": 0.85,
   "availability": 0.95,
   "availabilityBasis": "monthly",
   "contractYears": 12,
   "scodMonths": 18,
   "tariffBasis": "capacity",
   "ceilingTariff": null,
   "vgfLakhPerMwh": 0,
   "vgfPct": 0,
   "chargingBy": "procurer",
   "maintainCapacity": true
  },
  "charge": 4.57,
  "equityIrr": 0.14,
  "strategy": {
   "oversize": 0,
   "interval": 1
  },
  "evals": 381,
  "cohorts": [
   {
    "year": 1,
    "mwh": 620.3,
    "kind": "initial"
   },
   {
    "year": 2,
    "mwh": 18.4,
    "kind": "planned"
   },
   {
    "year": 3,
    "mwh": 19,
    "kind": "planned"
   },
   {
    "year": 4,
    "mwh": 19.5,
    "kind": "planned"
   },
   {
    "year": 5,
    "mwh": 20.1,
    "kind": "planned"
   },
   {
    "year": 6,
    "mwh": 20.7,
    "kind": "planned"
   },
   {
    "year": 7,
    "mwh": 21.3,
    "kind": "planned"
   },
   {
    "year": 8,
    "mwh": 21.9,
    "kind": "planned"
   },
   {
    "year": 9,
    "mwh": 22.6,
    "kind": "planned"
   },
   {
    "year": 10,
    "mwh": 23.3,
    "kind": "planned"
   },
   {
    "year": 11,
    "mwh": 24,
    "kind": "planned"
   },
   {
    "year": 12,
    "mwh": 24.7,
    "kind": "planned"
   }
  ],
  "compliance": [
   {
    "label": "Contracted power",
    "required": "250 MW",
    "design": "263 MW PCS",
    "ok": true
   },
   {
    "label": "Energy every year",
    "required": "500 MWh at the delivery point",
    "design": "lowest 500 MWh (year-end)",
    "ok": true
   },
   {
    "label": "Discharge duration",
    "required": "2.00 h",
    "design": "2.00 h at 250 MW",
    "ok": true
   },
   {
    "label": "Cycles",
    "required": "2/day · 730/yr",
    "design": "730 full cycles/yr in the fade model",
    "ok": true
   },
   {
    "label": "Round-trip efficiency",
    "required": "≥ 85.0%",
    "design": "88.6% → 86.6% (year 12)",
    "ok": true
   },
   {
    "label": "Availability",
    "required": "≥ 95.0% monthly",
    "design": "98.0% expected",
    "ok": true
   },
   {
    "label": "Contract term",
    "required": "12 years",
    "design": "modelled 12 years",
    "ok": true
   }
  ]
 }
}